The 9th International Symposium on Automation and Robotics in Construction Junes-5, 1992 Tokyo, Japan Time-dependent Evolution of Work Packages
نویسندگان
چکیده
We are working on a common information model called UNIWBS which uses the work breakdown structure concept. UNIWBS is intended to support project information integration and project planning and control as well. By using the UNIWBS, we are also developing a conceptual knowledge-based expert system called DYNAPACK for generating planning, design, and construction work packages. DYNAPACK will be a testbed to support timedependent project information evolution.
منابع مشابه
The 9th International Symposium on Automation and Robotics in Construction Junes-s,1992 Tokyo, Japan AUTOMATIC LEVEL CONTROL OF BULLDOZER BLADE BASED ON FUZZY THEORY
Ground leveling by bulldozer blade should be automatically controlled since the operation is an exhausting work for the bulldozer operator. In this paper, fuzzy control is used for the blade operation in the ground leveling. A series of tests using model bulldozing vehicle are carried out to check the effect of membership functions in the fuzzy control and the vehicle speed. Moreover some tests...
متن کاملThe 9th International Symposium on Automation and Robotics in Construction June 3-5,1992 Tokyo, Japan An Object-Oriented Simulation System for Construction Operations
This paper presents the methodology for simulating the process of construction operations by using object-oriented approach. Authors developed a prototype system to model construction operations and to simulate their behavior at site, which included the random effects of weather and productivity in operations. Through the implementations of this prototype system, authors concluded the object-or...
متن کاملThe 9th International Symposium on Automation and Robotics in Construction June 3-5,1992 Tokyo, Japan TASK AND MOTION PLANNING TECHNIQUE FOR DESIGNING GROUP CONTROL SYSTEM IN ROBOTIC CONSTRUCTION WORK
The purpose of this paper is to describe a task and motion planning technique for designing a group control system in robotic construction works. This technique deals with hierarchical control of multiple robots and peripheral machinery in an automated construction work-cell. The technique consists of two phases: the task planing and the motion planning. The task planning phase illustrates the ...
متن کاملThe 9th International Symposium on Automation and Robotics in Construction June 3-5,1992 Tokyo, Japan
This paper reports on the recent advances made in developing an autonomous robot excavator. Previous work on a fifth-scale model was reported at earlier symposia, but the technology has now been transferred to a real excavator LUCIE Lancaster University Computerised Intelligent Excavator. The paper concentrates on the architecture of the software control which enables the machine to modify its ...
متن کاملThe 9th International Symposium on Automation and Robotics in Construction June 3-5,1992 Tokyo, Japan Management of Spatial Information For Construction Planning and Design Using Geographical Information Systems (GIS)
Geographic information systems (GIS), a technology for spatial data analysis which is widely used in geology, appears to have significant potential in construction applications. GIS as well as computer-aided design (CAD) are two computerized systems widely used in engineering design and spatial management. Currently, CAD is the most popular tool in geometric model creation. However, due to the ...
متن کامل