Value-based Software Engineering: a Case Study Using Earned Value
نویسندگان
چکیده
plex project. But it has absolutely nothing to say about the stakeholder value of the system the project is developing. It serves a purpose, but needs to be incorporated into feedback control systems that focus on the real stakeholder value being earned. The value-based software engineering agenda, described in the “Accounting for Value in Software Engineering” sidebar, seeks to integrate value considerations into current and emerging software engineering principles and practices, while developing an overall framework in which they compatibly reinforce each other. One area that VBSE addresses—value-based planning and control— includes principles and practices for extending traditional cost, schedule, and product planning and control techniques that also manage the value delivered to stakeholders.
منابع مشابه
Estimation of Project Performance Using Earned Value Management and Fuzzy Regression
Earned Value Management is a critical project managementmethodology that evaluates project performance from cost andschedule viewpoints. The novel theoretical framework presented in thispaper estimates future performance of project regarding the past relativeinformation. It benefits from fuzzy regression (FR) models in estimationprocess in order to deal with the vagueness and impreciseness ofre...
متن کاملEarned - Value Management Terminology
To the Editor: Although I enjoyed the article titled “Value-Based Software Engineering: A Case Study” (Barry Boehm and Li Guo Huang, March 2003, pp. 33-41), as a newly minted Project Management Professional and a contributor to the Project Management Institute’s Earned Value Analysis team, I was disappointed with the authors’ use of nonstandard terminology. The authors renamed the traditional t...
متن کاملSelf-Starting Control Chart and Post Signal Diagnostics for Monitoring Project Earned Value Management Indices
Earned value management (EVM) is a well-known approach in a project control system which uses some indices to track schedule and cost performance of a project. In this paper, a new statistical framework based on self-starting monitoring and change point estimation is proposed to monitor correlated EVM indices which are usually auto-correlated over time and non-normally distributed. Also, a new ...
متن کاملA New Version of Earned Value Analysis for Mega Projects Under Interval-valued Fuzzy Environment
The earned value technique is a crucial and important technique in analysis and control the performance and progress of mega projects by integrating three elements of them, i.e., time, cost and scope. This paper proposes a new version of earned value analysis (EVA) to handle uncertainty in mega projects under interval-valued fuzzy (IVF)-environment. Considering that uncertainty is very common i...
متن کاملMethodology based on MCDM for risk management in EPC projects: A Case Study of LPG Storage Tanks Construction
The most important aim of every project is on time completion, budget consideration and reaching the highest possible quality, based on contract. This paper suggests a methodology for risk management in engineering, procurement, and construction (EPC) projects. Risk management enables project teams to perform with minimum deviation from predetermined goals. The proposed methodology identifies a...