Scheduling preemptive open shops to minimize total tardiness

نویسنده

  • Ching-Fang Liaw
چکیده

This article considers the problem of scheduling preemptive open shops to minimize total tardiness. The problem is known to be NP-hard. An efficient constructive heuristic is developed for solving large-sized problems. A branch-and-bound algorithm that incorporates a lower bound scheme based on the solution of an assignment problem as well as various dominance rules are presented for solving medium-sized problems. Computational results for the 2-machine case are reported. The branch-and-bound algorithm can handle problems of up to 30 jobs in size within a reasonable amount of time. The solution obtained by the heuristic has an average deviation of less than 2% from the optimal value, while the initial lower bound has an average deviation of less than 11% from the optimal value. Moreover, the heuristic finds approved optimal solutions for over 65% of the problems actually solved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Minimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times

We consider an open shop scheduling problem with setup and processing times separately such that not only the setup times are dependent on the machines, but also they are dependent on the sequence of jobs that should be processed on a machine. A novel bi-objective mathematical programming is designed in order to minimize the total tardiness and the makespan. Among several mult...

متن کامل

Scheduling a variant of flowshop problems to minimize total tardiness

This paper studies no-wait flowshop scheduling problems to minimize total tardiness. This paper mathematically formulates the problem as an effective mixed integer linear programming model. Moreover, this paper proposes solution methods based on variable neighborhood search and simulated annealing algorithms. Besides, some well-known heuristics of classical flow shops are adapted to the case of...

متن کامل

The preemptive resource-constrained project scheduling problem subject to due dates and preemption penalties: An integer programming approach

Extensive research has been devoted to resource constrained project scheduling problem. However, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. In this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...

متن کامل

A Novel B and B Algorithm for a Unrelated Parallel Machine Scheduling Problem to Minimize the Total Weighted Tardiness

This paper presents a scheduling problem with unrelated parallel machines and sequencedependent setup times that minimizes the total weighted tardiness. A new branch-and-bound (B and B) algorithm is designed incorporating the lower and upper bounding schemes and several dominance properties. The lower and upper bounds are derived through an assignment problem and the composite dispatching rule ...

متن کامل

No-idle time Scheduling of Open shops: Modeling and Meta-heuristic Solution Methods

In some industries as foundries, it is not technically feasible to interrupt a processor between jobs. This restriction gives rise to a scheduling problem called no-idle scheduling. This paper deals with scheduling of no-idle open shops to minimize maximum completion time of jobs, called makespan. The problem is first mathematically formulated by three different mixed integer linear programming...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • European Journal of Operational Research

دوره 162  شماره 

صفحات  -

تاریخ انتشار 2005