Worst-Case Temperature Analysis for Different Resource Availabilities: A Case Study

نویسندگان

  • Lars Schor
  • Hoeseok Yang
  • Iuliana Bacivarov
  • Lothar Thiele
چکیده

With three-dimensional chip integration, the heat dissipation per unit area increases rapidly and may result in high on-chip temperatures. Real-time constraints cannot be guaranteed anymore as exceeding a certain threshold temperature can immediately reduce the systems reliability and performance. Dynamic thermal management methods are promising methods to prevent the system from overheating. However, when designing modern real-time systems that make use of such thermal management techniques, the designer has to be aware of their effect on the maximum possible temperature of the system. This paper proposes an analytic framework to calculate the worst-case temperature of a system with general resource availabilities. The event and resource model is based on real-time and network calculus so that the method is able to handle a broad range of uncertainties in terms of task arrivals and available computational power. In various case studies, the proposed framework is applied to an advanced multimedia system to analyze the impact of dynamic frequency scaling and thermal-aware scheduling techniques on the worst-case temperature of an embedded real-time system.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Worst-case temperature analysis for different resource models

The rapid increase in heat dissipation in real-time systems imposes various thermal issues. For instance, real-time constraints cannot be guaranteed if a certain threshold temperature is exceeded, as it would immediately reduce the system reliability and performance. Dynamic thermal management techniques are promising methods to prevent a system from overheating. However, when designing real-ti...

متن کامل

Uncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem

Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...

متن کامل

Sensitivity Analysis Based Comparative Assessment of Resource Mix Using MCDM Technique: A Case Study of Thar Desert, India

In the last decade, there has been a lot of focus on sustainable development in the electrical power industry to meet the growing energy demand. This has led to an increase in the integration of renewable energy sources (RES). In addition to being abundantly available, the RES offers advantages such as low environmental impact and increased social development of rural communities which are impe...

متن کامل

Assessment and analysis of the sensitivity of different methods for estimating of the reference crop evapotranspiration in a cold and moderate climate (Case study: Saqez catchment)

The phenomenon of evapotranspiration causes water and moisture losses from water, soil and vegetation levels. Due to the small amount of atmospheric precipitation and water resource constraints in Iran, it is important to calculate it through a suitable method. The present research attempts to evaluate the evapotranspiration reference crop (ETo) and present it in the form of zoning map as a bas...

متن کامل

Optimal Portfolio Selection for Tehran Stock Exchange Using Conditional, Partitioned and Worst-case Value at Risk Measures

This paper presents an optimal portfolio selection approach based on value at risk (VaR), conditional value at risk (CVaR), worst-case value at risk (WVaR) and partitioned value at risk (PVaR) measures as well as calculating these risk measures. Mathematical solution methods for solving these optimization problems are inadequate and very complex for a portfolio with high number of assets. For t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011