MCA Based Performance Evaluation of Project Selection
نویسندگان
چکیده
Multi-criteria decision support systems are used in various fields of human activities. In every alternative multi-criteria decision making problem can be represented by a set of properties or constraints. The properties can be qualitative & quantitative. For measurement of these properties, there are different unit, as well as there are different optimization techniques. Depending upon the desired goal, the normalization aims for obtaining reference scales of values of these properties. This paper deals with a new additive ratio assessment method. In order to make the appropriate decision and to make a proper comparison among the available alternatives Analytic Hierarchy Process (AHP) and ARAS have been used. The uses of AHP is for analysis the structure of the project selection problem and to assign the weights of the properties and the ARAS method is used to obtain the final ranking and select the best one among the projects. To illustrate the above mention methods survey data on the expansion of optical fibre for a telecommunication sector is used. The decision maker can also used different weight combination in the decision making process according to the demand of the system.
منابع مشابه
Topographical evaluation of aphasia based on brain vascular territories
Topographical evaluation of aphasic brain lesions can enhance our knowledge of cognitive physiology and plasticity. This prospective study was conducted on 100 stroke-afflicted patients with aphasia admitted in Valie-Asr Hospital (Khorasan, Iran) in 2003. Topography of infarct lesions was detected by a neurologist based on the map of brain vascular territories in CT-scan. Aphasic lesions catego...
متن کاملTopographical evaluation of aphasia based on brain vascular territories
Topographical evaluation of aphasic brain lesions can enhance our knowledge of cognitive physiology and plasticity. This prospective study was conducted on 100 stroke-afflicted patients with aphasia admitted in Valie-Asr Hospital (Khorasan, Iran) in 2003. Topography of infarct lesions was detected by a neurologist based on the map of brain vascular territories in CT-scan. Aphasic lesions catego...
متن کاملA new framework for high-technology project evaluation and project portfolio selection based on Pythagorean fuzzy WASPAS, MOORA and mathematical modeling
High-technology projects are known as tools that help achieving productive forces through scientific and technological knowledge. These knowledge-based projects are associated with high levels of risks and returns. The process of high-technology project and project portfolio selection has technical complexities and uncertainties. This paper presents a novel two-parted method of high-technology ...
متن کاملA Model for Project Selecting with Limited Resources in Data Envelopment Analysis with Input and Output Fuzzy
In Evaluating Performance, Selecting a Subset from a Set of Solutions with Limited Resources is Essential. If There Is More Than One Input and Output, the Data Rnvelopment Analysis Optimization Models Are Evaluated and Performance Measurement Based on the Weighted Output Is Divided Weighted Input. In This Research, Two Models of Optimization with Limited Resources Present from Data Envelopment ...
متن کاملMulti-criteria approach to project portfolio selection considering structural hardness and correlations between projects
Project portfolio selection is very important subject of decision-makers in project-based organizations. The best assignment of resources to the most appropriate projects is necessary as financing projects with low benefit is just waste of organization's resources. However, existing project selection models pay not much attention the structure and special features of projects as a selection cri...
متن کاملA stochastic model for project selection and scheduling problem
Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- CoRR
دوره abs/1105.0390 شماره
صفحات -
تاریخ انتشار 2011