Scheduling problems received substantial attention during the last decennia. The job-shop problem is a very important scheduling problem, which is NP-hard in the strong sense and with well-known benchmark instances of relatively small size which attest the practical difficulty in solving it. The literature on job-shop scheduling problem includes several approximation and optimal algorithms. So far, no algorithm is known which solves the job-shop scheduling problem optimally with a lower complexity than the exhaustive enumeration of all feasible solutions. We propose such an algorithm, based on the well-known Bellman equation designed by Held and Karp to find optimal sequences and which offers the best complexity to solve the Traveling Salesman Problem known to this date. For the TSP this means O(n 2 2 n) which is exponentially better than O(n!) required to evaluate all feasible solutions. We reach similar results by first recovering the principle of optimality, which is not obtained for free in the case of the job-shop scheduling problem, and by performing a complexity analysis of the resulting algorithm. Our analysis is conservative but nevertheless exponentially better than brute force. We also show very promising results obtained from our implementation of this algorithm, which seem to indicate two things: firstly that there is room for improvement in the complexity analysis (we observe the generation of a number of solutions per state for the benchmark instances considered which is orders of magnitude lower than the bound we could devise) and secondly that the potential practical implications of this approach are at least as exciting as the theoretical ones, since we manage to solve some celebrated benchmark instances in processing times ranging from seconds to minutes. 1. Introduction. In a job-shop scheduling problem n jobs have to be processed by m dedicated machines. Each job has to visit all the machines following a specific order. The time each job requires in each machine depends on the job and on the machine and it is assumed to be known in advance. The jobs can not overlap in the machines and no job can be processed simultaneously by two or more machines. Preemption is not allowed. The goal is to schedule the jobs so as to minimize the makespan, which is the maximum of their completion time.
منابع مشابه
A fuzzy multi-objective linear programming approach for solving a new multi-objective job shop scheduling with sequence-dependent setup times
This paper presents a new mathematical model for a bi-objective job shop scheduling problem with sequence-dependent setup times that minimizes the weighted mean completion time and the weighted mean tardiness time. For solving this multi-objective model, we develop a fuzzy multi-objective linear programming (FMOLP) model. In this problem, a proposed FMOLP method is applied with respect to the o...
متن کاملCustomer Order Scheduling with Job-Based Processing and Lot Streaming In A Two-Machine Flow Shop
This paper considers a customer order scheduling (COS) problem in which each customer requests a variety of products processed in a two-machine flow shop. A sequence-independent attached setup for each machine is needed before processing each product lot. We assume that customer orders are satisfied by the job-based processing approach in which the same products from different customer orders f...
متن کاملA Flexible Job Shop Scheduling Problem with Controllable Processing Times to Optimize Total Cost of Delay and Processing
In this paper, the flexible job shop scheduling problem with machine flexibility and controllable process times is studied. The main idea is that the processing times of operations may be controlled by consumptions of additional resources. The purpose of this paper to find the best trade-off between processing cost and delay cost in order to minimize the total costs. The proposed model, flexibl...
متن کاملModelling and solving the job shop scheduling Problem followed by an assembly stage considering maintenance operations and access restrictions to machines
This paper considers job shop scheduling problem followed by an assembly stage and Lot Streaming (LS). It is supposed here that a number of products have been ordered to be produced. Each product is assembled with a set of several parts. The production system includes two stages. The first stage is a job shop to produce parts. Each machine can process only one part at the same time. The second ...
متن کاملSolving the Dynamic Job Shop Scheduling Problem using Bottleneck and Intelligent Agents based on Genetic Algorithm
The problem of Dynamic Job Shop (DJS) scheduling is one of the most complex problems of machine scheduling. This problem is one of NP-Hard problems for solving which numerous heuristic and metaheuristic methods have so far been presented. Genetic Algorithms (GA) are one of these methods which are successfully applied to these problems. In these approaches, of course, better quality of solutions...
متن کاملMinimizing the maximum tardiness and makespan criteria in a job shop scheduling problem with sequence dependent setup times
The job shop scheduling problem (JSP) is one of the most difficult problems in traditional scheduling because any job consists of a set operations and also any operation processes by a machine. Whereas the operation is placed in the machine, it is essential to be considering setup times that the times strongly depend on the various sequencing of jobs on the machines. This research is developed ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Computers & OR
دوره 39 شماره
صفحات -
تاریخ انتشار 2012