Controlled Tripping of Overheated Lines Mitigates Power Outages
نویسندگان
چکیده
We study the evolution of fast blackout cascades in the model of the Polish (transmission) power grid (2700 nodes and 3504 transmission lines). The cascade is initiated by a sufficiently severe initial contingency tripping. It propagates via sequential trippings of many more overheated lines, islanding loads and generators and eventually arriving at a fixed point with the surviving part of the system being power-flow-balanced and the rest of the system being outaged. Utilizing an improved form of the quasi-static model for cascade propagation introduced in our earlier study (Statistical Classification of Cascading Failures in Power Grids, IEEE PES GM 2011), we analyze how the severity of the cascade depends on the order of tripping overheated lines. Our main observation is that the order of tripping has a tremendous effect on the size of the resulting outage. Finding the “best” tripping, defined as causing the least damage, constitutes a difficult dynamical optimization problem, whose solution is most likely computationally infeasible. Instead, here we study performance of a number of natural heuristics, resolving the next switching decision based on the current state of the grid. Overall, we conclude that controlled intentional tripping is advantageous in the situation of a fast developing extreme emergency, as it provides significant mitigation of the resulting damage.
منابع مشابه
Power Differential based Wide Area Protection
Current differential based wide area protection (WAP) has recently been proposed as a technique to increase the reliability of protection systems. It increases system stability and can prevent large contingencies such as cascading outages and blackouts. This paper describes how power differential protection (PDP) can be used within a WAP and shows that the algorithm operates correctly for a...
متن کاملEffects of CT and VT Connection Point on Distance Protection of Transmission Lines with FACTS Devices
This paper presents the effects of instrument transformers connection points on the measured impedance by distance relays in the presence of Flexible Alternating Current Transmission System (FACTS) devices with series connected branch. Distance relay tripping characteristic itself depends on the power system structural conditions, pre-fault operational conditions, and especially the ground ...
متن کاملChance Constrained Optimal Power Flow: Risk-Aware Network Control under Uncertainty
When uncontrollable resources fluctuate, optimal power flow (OPF), routinely used by the electric power industry to redispatch hourly controllable generation (coal, gas, and hydro plants) over control areas of transmission networks, can result in grid instability and, potentially, cascading outages. This risk arises because OPF dispatch is computed without awareness of major uncertainty, in par...
متن کاملEvaluating the potential of cascading failure occurrence due to line outage in power systems by information theory method and radial base functions
In power systems, a connected topology is created to increase reliability and economic performance. Increasing dimensions of power systems on the one hand and the need to continuously monitor power systems for secure operation on the other challenge the evaluation of power system security. In such conditions, due to economic conditions and considering the fast growth of consumers in a power sys...
متن کاملSTATCOM Optimal Allocation in Transmission Grids Considering Contingency Analysis in OPF Using BF-PSO Algorithm
In this paper, a combinational optimization algorithm is introduced to obtain the best size and location of Static Compensator (STATCOM) in power systems. Its main contribution is considering contingency analysis where lines outages may lead to infeasible solutions especially at peak loads and it commonly can be vanished by load-shedding. The objective of the proposed algorithm is firstly to pr...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- CoRR
دوره abs/1104.4558 شماره
صفحات -
تاریخ انتشار 2011