Modelling and assessment of critical risks in BOT road projects

نویسندگان

  • A. V. THOMAS
  • SATYANARAYANA N. KALIDINDI
  • L. S. GANESH
چکیده

Over the years, many private sector participation (PSP) models have been evolved for infrastructure procurement and the Build-Operate-Transfer (BOT) model is one of the most common approaches used for the same. Private infrastructure projects under BOT arrangement have a complex risk profile and to a considerable extent, the success of any BOT project is influenced by the degree to which various project risks are managed. The major steps involved in risk management of a project are risk identification, risk assessment and the processes of prioritization and response to the risks. The conventional risk assessment approaches may not be effective in privatized infrastructure projects because of the fact that, they have very long project lifecycle with many country and sector specific risk factors. The assessment of complex risks is often a difficult task when past data on similar risks are not available. In this research, a risk probability and impact assessment framework based on fuzzy-fault tree and the Delphi method is proposed. The framework includes extensive scenario modelling of critical risks in projects and systematic processing of professional judgement (subjective knowledge) of experts and is developed and demonstrated in the context of critical risks in Indian BOT road projects. Detailed scenario modelling of most critical risks such as traffic revenue risk, delay in land acquisition, demand risk and delay in financial closure are also presented. The proposed risk assessment framework is generic and can be applied with appropriate modifications to suit any complex developmental project where past data is inadequate for risk assessment.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Identification of Pattern used in Determination of Critical Success Factors in ITS Projects, Case Study: Road Maintenance and Transportation Organization

One of the risks recognized by relevant authorities is the risk of outsourcing ITS projects. The purpose of this study was to design and explain the pattern of determining the critical success factors in outsourcing large-scale ITS projects in the Ministry of Roads and Urban Development (Road Maintenance and Transportation Organization). This study was performed using qualitative method. The pa...

متن کامل

Determination of Concession Period in Build-Operate-Transfer Projects Using Fuzzy Logic

The build-operate-transfer (BOT) projects are a popular method of privatization of public infrastructure development. There are several risks which might affect a BOT project negatively. Concession period is one of the most important decision variables in arranging a BOT-type contract which should be determined considering the existing risks and uncertainties. A longer concession period is more...

متن کامل

Safety risk assessment and ranking in the construction projects with F.M.E.A and fuzzy T.O.P.S.I.S

Abstract Introduction: Construction projects are one of the most important sectors of the economy of the country, which has a high capacity for job creation. Construction projects are part of a huge and strategic set of civil engineering projects that unfortunately have a large share of work-related accidents due to lack of attention to safety. One of the most important issues that can contrib...

متن کامل

A Model for Prioritizing the Risks Associated with Road Construction Projects Based on Generalized Secondary Goal

   This paper aims at providing a new model based on Data Envelopment Analysis (DEA) to prioritize project risks. It is clear that the large amounts of involved capitals, the long term of infrastructure projects’ implementation, and the project management problems in on-time completion of projects indicate the necessity of paying particular attention to this issue and conducting applied researc...

متن کامل

ارزیابی ریسک های ایمنی موثر بر سلامت افراد در پروژه های بلند مرتبه سازی با رویکرد فازی

  Background and aims: Today, due to the increasing of urban population and hence land shortage, construction of tall buildings are rising . The potential risks of such projects arecomparatively more than the conventional construction as the construction industry is reliant on manpower. Therefore attention to the health and safety of persons engaged in construction projects is essential.The pur...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006