Optimal allocation of fault current limiters for sustaining overcurrent relays coordination in a power system with distributed generation
نویسندگان
چکیده
Overcurrent relay; Coordination; Fault current limiter; Optimization Abstract This paper addresses the problem of overcurrent relays (OCRs) coordination in the presence of DGs. OCRs are optimally set to work in a coordinated manner to isolate faults with minimal impacts on customers. The penetration of DGs into the power system changes the fault current levels seen by the OCRs. This can deteriorate the coordinated operation of OCRs. Operation time difference between backup and main relays can be below the standard limit or even the backup OCR can incorrectly work before the main OCR. Though resetting of OCRs is tedious especially in large systems, it cannot alone restore the original coordinated operation in the presence of DGs. The paper investigates the optimal utilization of fault current limiters (FCLs) to maintain the directional OCRs coordinated operation without any need to OCRs resetting irrespective of DGs status. It is required to maintain the OCRs coordination at minimum cost of prospective FCLs. Hence, the FCLs location and sizing problem is formulated as a constrained multi-objective optimization problem. Multi-objective particle swarm optimization is adopted for solving the optimization problem to determine the optimal locations and sizes of FCLs. The proposed algorithm is applied to meshed and radial power systems at different DGs arrangements using different types of FCLs.Moreover, the OCRs coordination problem is studied when the system includes both directional and non-directional OCRs. Comparative analysis of results is provided. a 2015 Faculty of Engineering, Alexandria University. Production and hosting by Elsevier B.V. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).
منابع مشابه
Providing a protection method to support distributed generation against transient voltage instability
The analysis of transient stability in electric power systems and the penetration coefficient of scattered productions play important roles in the regulation of protective equipment, so these parameters should be considered two main factors in the electrical protection of power networks. Overcurrent relays are used as one of the simplest and most effective solutions for power system protection....
متن کاملProviding A New Characteristic for Overcurrent Relays
This with the integration of distributed generation (DG) to meshed distribution systems, the operating time of the protective system becomes a major concern in order to avoid nuisance DG tripping. This paper proposes a new tripping characteristic for directional overcurrent relays (DOCRs) that can achieve a higher possible reduction of overall relays operating time in meshed distribution networ...
متن کاملهماهنگی بهینه رله های اضافه جریان جهتی در شبکه های توزیع با در نظر گرفتن پایداری گذرای منابع تولید پراکنده سنکرون
Integration of distributed generation (DG) into distribution networks causes some protection challenges, which can be solved by appropriate coordination of directional overcurrent relays. The optimal coordination of directional overcurrent relays is an important task to fulfill the protection requirements of the network. This paper presents an optimal coordination method for directional overcur...
متن کاملSystem Stability-Constrainted Optimal Protection Coordination in the Microgrid Including Renewable Energy Sources and Energy Storage
In this paper, the system stability-constrianted optimal protection coordination (SSCOPC) as stochastic problem in the microgrid with grid-connected and islanded operation modes, including renewable energy sources (RESs) and energy storage systems (ESSs), is presented. This problem to optimal regulation of the dual setting overcurrent relays (DSORs) and selecting the reactance size of fault cur...
متن کاملConsidering Pilot Protection in the Optimal Coordination of Distance and Directional Overcurrent Relays
The aim of the relay coordination is that protection systems detect and isolate the faulted part as fast and selective as possible. On the other hand, in order to reduce the fault clearing time, distance protection relays are usually equipped with pilot protection schemes. Such schemes can be considered in the distance and directional overcurrent relays (D&DOCRs) coordination to achieve faster ...
متن کاملذخیره در منابع من