Multi-product lot-sizing and scheduling on unrelated parallel machines
نویسندگان
چکیده
We study a problem of optimal scheduling and lot-sizing a number of products on m unrelated parallel machines to satisfy given demands. A sequence dependent setup time is required between lots of different products. The products are assumed to be all continuously divisible or all discrete. The criterion is to minimize the time, at which all the demands are satisfied, Cmax, or the maximum lateness of the product completion times from the given due dates, Lmax. The problem is motivated by the real-life scheduling applications in multiproduct plants. We derive properties of optimal solutions, NP-hardness proofs, enumeration and dynamic programming algorithms for various special cases of the problem. The major contribution is an NP-hardness proof and pseudo-polynomial algorithms linear in m for the case, in which the number of products is a given constant. The results can be adapted for solving a production line design problem.
منابع مشابه
Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line
This paper breaks new ground by modelling lot sizing and scheduling in a flexible flow line (FFL) simultaneously instead of separately. This problem, called the ‘General Lot sizing and Scheduling Problem in a Flexible Flow Line’ (GLSP-FFL), optimizes the lot sizing and scheduling of multiple products at multiple stages, each stage having multiple machines in parallel. The objective is to satisf...
متن کاملMulti-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints
This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...
متن کاملSolving a New Multi-objective Unrelated Parallel Machines Scheduling Problem by Hybrid Teaching-learning Based Optimization
This paper considers a scheduling problem of a set of independent jobs on unrelated parallel machines (UPMs) that minimizesthe maximum completion time (i.e., makespan or ), maximum earliness ( ), and maximum tardiness ( ) simultaneously. Jobs have non-identical due dates, sequence-dependent setup times and machine-dependentprocessing times. A multi-objective mixed-integer linear programmi...
متن کاملFinite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups
This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (FFL) and delivers them directly to an assembly facility (AF). The objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage....
متن کاملA bi-objective model for a scheduling problem of unrelated parallel batch processing machines with fuzzy parameters by two fuzzy multi-objective meta-heuristics
This paper considers a bi-objective model for a scheduling problem of unrelated parallel batch processing machines to minimize the makespan and maximum tardiness, simultaneously. Each job has a specific size and the data corresponding to its ready time, due date and processing time-dependent machine are uncertain and determined by trapezoidal fuzzy numbers. Each machine has a specific capacity,...
متن کاملIndustrial Engineering and Computer Sciences Division (G2I) MULTI-PRODUCT LOT SIZING AND SCHEDULING ON UNRELATED PARALLEL MACHINES
We study a problem of optimal scheduling and lot-sizing a number of products on m unrelated parallel machines to satisfy given demands. A sequence dependent setup time is required between lots of different products. The products are assumed to be all continuously divisible or all discrete. The criterion is to minimize the time, at which all the demands are satisfied, Cmax, or the maximum latene...
متن کامل