Dispersion and bioaccumulation of elements from an open-pit olivine mine in Southwest Greenland assessed using lichens, seaweeds, mussels and fish.

نویسنده

  • Jens Søndergaard
چکیده

This study investigated dispersion and bioaccumulation of mining-related elements from an open-pit olivine mine at Seqi in Southwest Greenland (64° N) using lichens (Flavocetraria nivalis), seaweeds (Fucus vesiculosus), mussels (Mytilus edulis) and fish (Myoxocephalus scorpius). The mine operated between 2005 and 2009, and samples were taken every year within a monitoring area 0-17 km from the mine during the period 2004-2011. A total of 46 elements were analysed in the samples. After mining began, highly elevated metal concentrations, especially nickel (Ni), chromium (Cr), iron (Fe) and cobalt (Co), were observed in lichens relative to pre-mining levels (up to a factor of 130) caused by dust dispersion from the mining activity. Elevated metal concentrations could be measured in lichens in distances up to ~5 km from the mine/ore treatment facility. Moderately elevated concentrations of Ni and Cr (up to a factor of 7) were also observed in seaweeds and mussels but only in close vicinity (<1 km) to the mine. Analyses of fish showed no significant changes in element composition. After mine closure, the elevated metal concentrations in lichens, seaweeds and mussels decreased markedly, and in 2011, significantly elevated metal concentrations could only be measured in lichens and only within a distance of 1 km from the mine.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Back analysis of inter-ramp slope failure in Teghout copper mine

Slope stability is one of the most important issues in open pit mining design. The main purpose of any open pit mine design is to propose an optimal excavation configuration, considering safety, ore recovery and financial return. An accurate pit slope design which accounts for the mine geology, structural geology, rock mass properties, and hydrogeology models of the mine area, drastically enhan...

متن کامل

Determination of Ultimate Pit Limits in Open Mines Using Real Option Approach

Planning and design procedure of an open pit mining project just can be started after ultimate pit determination. In the carried out study in this paper it was shown that the most important factor in ultimate pit determination and in consequence in the whole planning and design procedure of an open pit mine is the metal price. Metal price fluctuations in recent years were exaggerated and impose...

متن کامل

Application of artificial neural network and genetic algorithm to modelling the groundwater inflow to an advancing open pit mine

In this study, a hybrid intelligent model has been designed to predict groundwater inflow to a mine pit during its advance. Novel hybrid method coupling artificial neural network (ANN) with genetic algorithm (GA) called ANN-GA, was utilised. Ratios of pit depth to aquifer thickness, pit bottom radius to its top radius, inverse of pit advance time and the hydraulic head (HH) in the observation w...

متن کامل

Geostatistical simulation of RQD variable using investigation of spatial continuity between Quaternary alluvial layer and hard rock of Gohar-Zamin mine to the determination of permeable zones

In this research, a sequential Gaussian simulation method has been used to determine the permeable zones in the hard-rock aquifer of the Gohr-Zamin open pit mine. For this purpose, 4946 RQD data from eighty-seven exploratory boreholes was used and exploratory-spatial data analysis of these data was performed using the preliminary statistics, location maps, histograms and variograms. Results of ...

متن کامل

An imperialist competitive algorithm for solving the production scheduling problem in open pit mine

Production scheduling (planning) of an open-pit mine is the procedure during which the rock blocks are assigned to different production periods in a way that the highest net present value of the project achieved subject to operational constraints. The paper introduces a new and computationally less expensive meta-heuristic technique known as imperialist competitive algorithm (ICA) for long-term...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Environmental monitoring and assessment

دوره 185 8  شماره 

صفحات  -

تاریخ انتشار 2013