Identifying the period of a step change in high-yield processes

نویسندگان

  • Rassoul Noorossana
  • Abbas Saghaei
  • Kamran Paynabar
  • Sara Abdi
چکیده

Research Identifying thePeriodofaStep Change inHigh-YieldProcesses Rassoul Noorossana1,∗,†, Abbas Saghaei2, Kamran Paynabar3 and Sara Abdi4 1Industrial Engineering Department, Iran University of Science and Technology, Tehran 16844, Iran 2Industrial Engineering Department, Islamic Azad University—Science and Research Campus, Tehran, Iran 3Industrial and Operations Engineering Department, University of Michigan, Ann Arbor, MI, U.S.A. 4Industrial Engineering Department, Islamic Azad University—South Campus, Tehran, Iran

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Change Point Estimation in High Yield Processes in the Presence of Serial Correlation

Change point estimation is as an effective method for identifying the time of a change in production and service processes. In most of the statistical quality control literature, it is usually assumed that the quality characteristic of interest is independently and identically distributed over time. It is obvious that this assumption could be easily violated in practice. In this paper, we use m...

متن کامل

Identifying the change time of multivariate binomial processes for step changes and drifts

In this paper, a new control chart to monitor multi-binomial processes is first proposed based on a transformation method. Then, the maximum likelihood estimators of change points designed for both step changes and linear-trend disturbances are derived. At the end, the performances of the proposed change-point estimators are evaluated and are compared using some Monte Carlo simulation experimen...

متن کامل

Identifying the time of a step change in AR(1) auto-correlated simple linear profiles

Assuming a first-order auto-regressive model for the auto-correlation structure between observations, in this paper, a transformation method is first employed to eliminate the effect of auto-correlation. Then, a maximum likelihood estimator (MLE) of a step change in the parameters of the transformed model is derived and three separate EWMA control charts are used to monitor the parameters of th...

متن کامل

A Novel Clustering Approach for Estimating the Time of Step Changes in Shewhart Control Charts

  Although control charts are very common to monitoring process changes, they usually do not indicate the real time of the changes. Identifying the real time of the process changes is known as change-point estimation problem. There are a number of change point models in the literature however most of the existing approaches are dedicated to normal processes. In this paper we propose a novel app...

متن کامل

An Evaluation of the Optimal Change Scenarios of Land Use and their Impacts on the Hydrological Parameters: A Case Study of Dinevar Watershed

EXTENDED ABSTRACT      The land use change of watersheds has entailed many impacts on the processes of erosion and sediment yield over the time, and has caused the loss of soil quality and fertility. On the other hand, an increase in the sediment generation and its accumulation would reduce the capacity of the reservoirs. In this respect, the purpose of this study was to evaluate the effects o...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Quality and Reliability Eng. Int.

دوره 25  شماره 

صفحات  -

تاریخ انتشار 2009