Integrated Control and Real-Time Scheduling Integrated Control and Real-Time Scheduling
نویسنده
چکیده
The topic of the thesis is codesign of flexible real-time control systems. Integrating control theory and real-time scheduling theory, it is possible to achieve higher resource utilization and better control performance. The integration requires new tools for analysis, design, and implementation. The problem of scheduling the individual parts of a control algorithm is studied. It is shown how subtask scheduling can reduce the input-output latency in a set of control tasks. Deadline assignment under different scheduling policies is considered. A feedback scheduling architecture for control tasks is introduced. The scheduler uses feedback from execution-time measurements and feedforward from workload changes to adjust the sampling periods of a set of control tasks so that the combined performance of the controllers is optimized. The Control Server, a novel computational model for real-time control tasks, is presented. The model combines time-triggered I/O with dynamic, reservation-based task scheduling. The model provides short input-output latencies and minimal jitter for the controllers. It also allows control tasks to be treated as scalable real-time components with predictable performance. Two MATLAB-based toolboxes for analysis and simulation of real-time control systems have been developed. The Jitterbug toolbox evaluates a quadratic cost function for a linear control system with timing variations. The tool makes it possible to investigate the impact of delay, jitter, lost samples, etc., on control performance. The TrueTime toolbox facilitates detailed cosimulation of distributed real-time control systems. The scheduling and execution of control tasks is simulated in parallel with the network communication and the continuous process dynamics.
منابع مشابه
Integrated capacitated transportation and production scheduling problem in a fuzzy environment
Nowadays, several methods in production management mainly focus on the different partners of supply chain management. In real world, the capacity of planes is limited. In addition, the recent decade has seen the rapid development of controlling the uncertainty in the production scheduling configurations along with proposing novel solution approaches. This paper proposes a new mathematical model...
متن کاملReal-time Scheduling of a Flexible Manufacturing System using a Two-phase Machine Learning Algorithm
The static and analytic scheduling approach is very difficult to follow and is not always applicable in real-time. Most of the scheduling algorithms are designed to be established in offline environment. However, we are challenged with three characteristics in real cases: First, problem data of jobs are not known in advance. Second, most of the shop’s parameters tend to be stochastic. Third, th...
متن کاملA Mathematical Model and Grouping Imperialist Competitive Algorithm for Integrated Quay Crane and Yard Truck Scheduling Problem with Non-crossing Constraint
In this research, an integrated approach is presented to simultaneously solve quay crane scheduling and yard truck scheduling problems. A mathematical model was proposed considering the main real-world assumptions such as quay crane non-crossing, precedence constraints and variable berthing times for vessels with the aim of minimizing vessels completion time. Based on the numerical results, thi...
متن کاملIntegrated Scheduling of Electric Vehicles and Demand Response Programs in a Smart Microgrid
Microgrid (MG) is one of the important blocks in the future smart distribution systems. The scheduling pattern of MGs affects distribution system operation. Also, the optimal scheduling of MGs will be result in reliable and economical operation of distribution system. In this paper, an operational planning model of a MG which considers multiple demand response (DR) programs is proposed. In the ...
متن کاملDynamic Cargo Trains Scheduling for Tackling Network Constraints and Costs Emanating from Tardiness and Earliness
This paper aims to develop a multi-objective model for scheduling cargo trains faced by the costs of tardiness and earliness, time limitations, queue priority and limited station lines. Based upon the Islamic Republic of Iran Railway Corporation (IRIRC) regulations, passenger trains enjoy priority over other trains for departure. Therefore, the timetable of cargo trains must be determined based...
متن کامل