Mixed-integer programming models for flowshop scheduling problems minimizing the total earliness and tardiness
نویسندگان
چکیده
Scheduling problems involving both earliness and tardiness costs have received significant attention in recent years. This type of problem became important with the advent of the justin-time (JIT) concept, where early or tardy deliveries are highly discouraged. In this work we examine the flowshop scheduling problem with no storage constraints and with blocking inprocess. In this latter environment, there are no buffers between successive machines; therefore intermediate queues of jobs waiting in the system for their next operations are not allowed. Performance is measured by the minimization of the sum of earliness and tardiness of the jobs. Mixed-integer models that represent these scheduling flowshop problems are presented. The models are evaluated and compared in several problems using commercial known software.
منابع مشابه
The preemptive resource-constrained project scheduling problem subject to due dates and preemption penalties: An integer programming approach
Extensive research has been devoted to resource constrained project scheduling problem. However, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. In this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...
متن کاملTabu search for non-permutation flowshop scheduling problem with minimizing total tardiness
This paper deals with the non-permutation flowshop problem which means that the job sequences are allowed to be different on machines. The objective function is minimizing the total tardiness. Firstly, three mixed-integer linear programming (MILP) models for non-permutation flowshop problems are described, and then are analyzed and assessed their relative effectiveness. Secondly, two Tabu searc...
متن کاملParticle swarm optimization for minimizing total earliness/tardiness costs of two-stage assembly flowshop scheduling problem in a batched delivery system
This paper considers a two-stage assembly flow shop scheduling problem. When all parts of each product are completed in the first stage, they are assembled into a final product on an assembly machine in the second stage. In order to reduce the delivery cost, completed products can be held until completion of some other products to be delivered in a same batch. The proposed problem addresses sch...
متن کاملMILP models and valid inequalities for the two-machine permutation flowshop scheduling problem with minimal time lags
In this paper, we consider the problem of scheduling on two-machine permutation flowshop with minimal time lags between consecutive operations of each job. The aim is to find a feasible schedule that minimizes the total tardiness. This problem is known to be NP-hard in the strong sense. We propose two mixed-integer linear programming (MILP) models and two types of valid inequalities which aim t...
متن کاملFuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flow Time through Genetic Algorithm
Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. One type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical model for...
متن کامل