Consideration of Gas Supply Contracts with Take-or-pay Clauses in the Brazilian Long-term Energy Planning
نویسندگان
چکیده
In Brazil’s long-term energy planning, the dispatch of thermal plants usually varies along a year. Such variation is essentially due to the predominance of the hydraulic mix in the system electric energy supply. For this reason, without preventive measures, a highly irregular cash flow occurs for natural gas (NG) providers, who supply gas for electric energy generators. In order to achieve more regularity for NG providers’ cash flows, supply contracts of this resource for electric energy generation usually contain special clauses, called take-or-pay – ToP. Such clauses force electric generators to pay each month a minimal financial amount, even if the effective use of NG in this period is smaller than the paid amount of resource. Without representing explicitly ToP clauses, the Brazilian model is currently forced to dispatch NG-fueled thermal plants in a compulsory minimal amount, corresponding to the financial lower bound required by the contract. The explicit consideration of ToP clauses in hydrothermal dispatch models yields a better application of NG and a smaller expected operation cost for the whole power system, because it introduces some flexibility in the decision of NG purchase and its use. As shown by our numerical experience, this flexibility may result in reduced water spillages in periods with favorable hydrology. The methodology presented in this work takes into account the characteristics of the ToP contracts in the Brazilian long-term energy planning and differs from other models found in the literature by the fact of aiming at a smaller expected operation cost of the whole system – National Interconnected System, because it treats the contracts from the operator point of view. This work presents the process of inclusion of the Leonardo A. M. Moraes Petrobras, Rio de Janeiro, Brazil E-mail: [email protected] Claudia Sagastizábal CEPEL, Electric Energy Research Center, Eletrobrás Group On leave from INRIA Rocquencourt, France. E-mail: [email protected] Maria Elvira P. Maceira CEPEL, Electric Energy Research Center, Eletrobrás Group UERJ. E-mail: [email protected]
منابع مشابه
The Impact of EU’s Competition Laws on the Long-Term Gas Contracts
Competion laws follow varions goals including economic targets such as increase of economic efficiency and consumers' welfare. This branch of law has resisted against agreements and contracts which endanger the consumers' or public welfare and has tried to prevent such contracts and processes. European Union is among the greatest consumers and importer of energy in the world. The most part of t...
متن کاملApplying Non-Contractual Methods and Quantitative Terms to Increase the Durability of Long-Term Natural Gas Sale Agreements
The success of long-term gas sales contracts is largely related to the ability of the seller and the buyer to adapt the terms of the contract to their conditions, infrastructure, facilities and market. If the buyer's demand changes from season to season and seasonally fluctuates, problems and complexities arise for the seller and he may need to provide the excess capacity to produce, refine and...
متن کاملAnalysis the Impact of Hydro Renewable Energy on Electricity Prices in Iran Using a Long-Run Dynamic Model
The energy crisis in recent years has led politicians and major countries around the world to take energy issues differently from the past and replace fossil fuels with renewable energies, including hydroelectricity, to reduce and save energy, controlling supply and demand energy and reduction of pollutant emissions has been widely welcomed. Accordingly, the present study investigates the impac...
متن کاملIntegrated Process Planning and Active Scheduling in a Supply Chain-A Learnable Architecture Approach
Through the lens of supply chain management, integrating process planning decisions and scheduling plans becomes an issue of great challenge and importance. Dealing with the problem paves the way to devising operation schedules with minimum makespan; considering the flexible process sequences, it can be viewed as a fundamental tool for achieving the scheme, too. To deal with this integration, t...
متن کاملSecurity-Based Co-Expansion Planning of Gas and Electricity Networks Considering Demand Response
Coordinated expansion planning of power plants has always attracted the attention of power industry planners to arrive at the optimal mix that assures adequacy of energy supply. Here, we model the coordinates for expansion of electricity and gas networks while considering technical constraints, in order to minimize the total cost of investment and operation of electricity and gas networks for a...
متن کامل