Scheduling a batch-processing machine subject to precedence constraints, release dates and identical processing times

نویسندگان

  • T. C. Edwin Cheng
  • J. J. Yuan
  • A. F. Yang
چکیده

We consider the single machine parallel-batching scheduling problem with precedence relations, release dates and identical processing times to minimize a regular objective function. When the processing times are unit, we give an O(n) time optimal algorithm. When there are no precedence relations, we solve this problem by dynamic programming in O(n) time. When the precedence relations are “layerly complete”, we solve this problem by a dynamic programming algorithm that runs in O(n) time. For the total weighted completion time minimization problem, we give an O(n) time 3 2 -approximation algorithm. For the makespan minimization problem, we give an O(n) time optimal algorithm and an expression of the minimum makespan.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT

In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...

متن کامل

Multi-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints

This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...

متن کامل

A fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates

This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...

متن کامل

An Efficient Bi-objective Genetic Algorithm for the Single Batch-Processing Machine Scheduling Problem with Sequence Dependent Family Setup Time and Non-identical Job Sizes

This paper considers the problem of minimizing make-span and maximum tardiness simultaneously for scheduling jobs under non-identical job sizes, dynamic job arrivals, incompatible job families,and sequence-dependentfamily setup time on the single batch- processor, where split size of jobs is allowed between batches. At first, a new Mixed Integer Linear Programming (MILP) model is proposed for t...

متن کامل

Stochastic Machine Scheduling with Precedence Constraints

We consider parallel, identical machine scheduling problems where the jobs are subject to precedence constraints, release dates, and the processing times of jobs are governed by independent probability distributions. The objective is to minimize the expected value of the total weighted completion time ∑w j C j , where w j 0. Building upon a linear programming relaxation by Möhring, Schulz, and ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Computers & OR

دوره 32  شماره 

صفحات  -

تاریخ انتشار 2005