The impact of a large-scale power outage on hemodialysis center operations.
نویسندگان
چکیده
INTRODUCTION On June 29, 2012, mid-Atlantic storms resulted in a large-scale power outage affecting up to three million people across multiple (US) states. Hemodialysis centers are dependent on electricity to provide dialysis care to end-stage renal disease patients. The objective of this study was to determine how the power outage impacted operations in a sample of hemodialysis centers in the impacted regions. METHODS The sample consisted of all hemodialysis centers located in the District of Columbia and a total of five counties with the largest power losses in West Virginia, Virginia, and Maryland. A semi-structured interview guide was developed, and the charge nurse or supervisor in each facility was interviewed. The survey questions addressed whether their centers lost power, if so, for how long, where their patients received dialysis, whether their centers had backup generators, and if so, whether they had any problems operating them, and whether their center received patients from other centers if they had power. RESULTS Calls were placed to 90 dialysis centers in the sampled areas and a 90% response rate was achieved. Overall, hemodialysis operations at approximately 30% (n = 24) of the centers queried were impacted by the power outage. Of the 36 centers that lost power, 31% (n = 11) referred their patients to other dialysis centers, 22% (n = 8) accommodated their patients during a later shift or on a different day; the rest of the centers either experienced brief power outages that did not affect operations or experienced a power outage on days that the center is usually closed. Some centers in the study cohort reported receiving patients from other centers for dialysis 33% (n = 27). Thirty-two percent (n = 26) of the centers queried had backup generators on site. Eleven percent (n = 4) of the centers experiencing power outages reported that backup generators were brought in by their parent companies. CONCLUSIONS Comprehensive emergency planning for dialysis centers should include provisions for having backup generators on site, having plans in place for the timely delivery of a generator during a power outage, or having predesignated backup dialysis centers for patients to receive dialysis during emergencies. Most dialysis centers surveyed in this study were able to sustain continuity of care by implementing such pre-existing emergency plans.
منابع مشابه
Determination of Composite System Adequacy Equivalents Using a Reduction Technique: a Case Study on a Regional Electric Company
Reliability evaluation of a large-scale composite power system faces to numerous events/outage and consequently imposes an extensive burden of calculations. In order to simplify the problem, determination of an equivalent system for large-scale power system is inevitable. This paper proposes a framework as reduction technique to separate a composite power system to three areas: external area, o...
متن کاملEvaluating the potential of cascading failure occurrence due to line outage in power systems by information theory method and radial base functions
In power systems, a connected topology is created to increase reliability and economic performance. Increasing dimensions of power systems on the one hand and the need to continuously monitor power systems for secure operation on the other challenge the evaluation of power system security. In such conditions, due to economic conditions and considering the fast growth of consumers in a power sys...
متن کاملEvaluation of Penetration Level of Large-Scale Photovoltaic System on Voltage Stability of Power System
A power system is a nonlinear one. When turbulence occurs in the power system, the stability of the system depends on the initial operating conditions and the nature of the turbulence. Nowadays renewable energy sources including photovoltaic have a key role to meet high demand of modern societies and to maintain voltage of the buses, while they also provide clean electrical energy. However, inc...
متن کاملThe Impact of Blackout on Manufacturing: Evidences from Iran’s Industrial Plants
Shortage of electric power is a serious issue for production, especially for those that rely more on electricity. In this paper, we investigate the effect of non-distributed electricity (blackout) on Iranian industry. The sources are derived from two undistributed energy data collected from 39 distribution companies and database of industrial plants. The final panel data is from industrial plan...
متن کاملDistributed multi-agent Load Frequency Control for a Large-scale Power System Optimized by Grey Wolf Optimizer
This paper aims to design an optimal distributed multi-agent controller for load frequency control and optimal power flow purposes. The controller parameters are optimized using Grey Wolf Optimization (GWO) algorithm. The designed optimal distributed controller is employed for load frequency control in the IEEE 30-bus test system with six generators. The controller of each generator is consider...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Prehospital and disaster medicine
دوره 28 6 شماره
صفحات -
تاریخ انتشار 2013