GRASP and path relinking for project scheduling under partially renewable resources

نویسندگان

  • Ramón Alvarez-Valdés
  • Enric Crespo
  • José Manuel Tamarit
  • Fulgencia Villa
چکیده

Recently, in the field of project scheduling problems the concept of partially renewable resources has been introduced. Theoretically, it is a generalization of both renewable and non-renewable resources. From an applied point of view, partially renewable resources allow us to model a large variety of situations that do not fit in classical models, but can be found in real problems in timetabling and labor scheduling. In this paper we develop some preprocessing techniques and several heuristic algorithms for the problem. Preprocessing significantly reduces the dimension of the problems, therefore improving the efficiency of solution procedures. Heuristic algorithms based on GRASP and Path relinking are then developed and tested on existing test instances, obtaining excellent results.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A hybrid GRASP algorithm for minimizing total weighted resource tardiness penalty costs in scheduling of project networks

In this paper, we consider scheduling of project networks under minimization of total weighted resource tardiness penalty costs. In this problem, we assume constrained resources are renewable and limited to very costly machines and tools which are also used in other projects and are not accessible in all periods of time of a project. In other words, there is a dictated ready date as well as a d...

متن کامل

A Hybrid GRASP Algorithm for Minimizing Total Weighted Resource Tardiness Penalty Costs in Scheduling of Project Networks

KEYWORDS In this paper, we consider scheduling of project networks under minimization of total weighted resource tardiness penalty costs. In this problem, we assume constrained resources are renewable and limited to very costly machines and tools which are also used in other projects and are not accessible in all periods of time of a project. In other words, there is a dictated ready date as we...

متن کامل

Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm

This paper considers a project scheduling problem with the objective of minimizing resource availability costs required to execute the activities in a project by a given project deadline. The project contains activities interrelated by finish-starttype precedence relations with a time lag of zero, which require a set of renewable resources. Two metaheuristics, path relinking and genetic algorit...

متن کامل

Parallel GRASP with path-relinking for job shop scheduling

In the job shop scheduling problem (JSP), a finite set of jobs is processed on a finite set of machines. Each job is required to complete a set of operations in a fixed order. Each operation is processed on a specific machine for a fixed duration. A machine can process no more than one job at a time and once a job initiates processing on a given machine it must complete processing without inter...

متن کامل

Parallel Strategies for Grasp with Path-relinking

A Greedy Randomized Adaptive Search Procedure (GRASP) is a metaheuristic for combinatorial optimization. It usually consists of a construction procedure based on a greedy randomized algorithm and local search. Path-relinking is an intensification strategy that explores trajectories that connect high quality solutions. We analyze two parallel strategies for GRASP with path-relinking and propose ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • European Journal of Operational Research

دوره 189  شماره 

صفحات  -

تاریخ انتشار 2008