Multi-objective Integration of Flexible Collaborative Planning and Fuzzy Flexible Lot-Splitting Scheduling Based on the Pareto Optimal
نویسندگان
چکیده
Since that a job usually contains several working procedures in actual production, and it’s hard to optimize the flexible collaborative planning, the flexible lot splitting and scheduling of the job simultaneously in batch production mode, a model for multiobjective integration of flexible collaborative planning and fuzzy lot-splitting scheduling is established. We take four performance indicators below which are the most common as standards to optimize the model: average delivery satisfaction, fuzzy total cost, fuzzy completion time and average credibility of job tardiness, and then a multi-objective algorithm based on the Pareto optimal is established. In this algorithm, we design the integrated coding scheme, which include collaboration chromosome, lot-splitting chromosome and scheduling chromosome, meanwhile the Pareto optimal scheme is designed. Finally, the efficiency of the model and algorithm is proved by the simulation.
منابع مشابه
A Hierarchical Production Planning and Finite Scheduling Framework for Part Families in Flexible Job-shop (with a case study)
Tendency to optimization in last decades has resulted in creating multi-product manufacturing systems. Production planning in such systems is difficult, because optimal production volume that is calculated must be consistent with limitation of production system. Hence, integration has been proposed to decide about these problems concurrently. Main problem in integration is how we can relate pro...
متن کاملThe Finite Horizon Economic Lot Scheduling in Flexible Flow Lines
This paper addresses the common cycle multi-product lot-scheduling problem in flexible flow lines (FFL) where the product demands are deterministic and constant over a finite planning horizon. Objective is minimizing the sum of setup costs, work-in-process and final products inventory holding costs per time unite while satisfying the demands without backlogging. This problem consists of a combi...
متن کاملSolving Flexible Job Shop Scheduling with Multi Objective Approach
In this paper flexible job-shop scheduling problem (FJSP) is studied in the case of optimizing different contradictory objectives consisting of: (1) minimizing makespan, (2) minimizing total workload, and (3) minimizing workload of the most loaded machine. As the problem belongs to the class of NP-Hard problems, a new hybrid genetic algorithm is proposed to obtain a large set of Pareto-optima...
متن کاملMULTI-OBJECTIVE ROUTING AND SCHEDULING IN FLEXIBLE MANUFACTURING SYSTEMS UNDER UNCERTAINTY
The efficiency of transportation system management plays an important role in the planning and operation efficiency of flexible manufacturing systems. Automated Guided Vehicles (AGV) are part of diversified and advanced techniques in the field of material transportation which have many applications today and act as an intermediary between operating and storage equipment and are routed and contr...
متن کاملSimultaneous Lot Sizing and Scheduling in a Flexible Flow Line
This paper breaks new ground by modelling lot sizing and scheduling in a flexible flow line (FFL) simultaneously instead of separately. This problem, called the ‘General Lot sizing and Scheduling Problem in a Flexible Flow Line’ (GLSP-FFL), optimizes the lot sizing and scheduling of multiple products at multiple stages, each stage having multiple machines in parallel. The objective is to satisf...
متن کامل