Comparative study between a single unit system and a two-unit cold standby system with varying demand
نویسندگان
چکیده
The concerned paper illustrates the comparison of two stochastic models of a cable manufacturing plant with varying demand. Here, it shows the comparison between a single unit system (Model 1) and a two-unit cold standby system (Model 2). In Model 1, the system is either in working state on some demand or put to shut down mode on no demand. In Model 2, at initial stage, one of the units is operative while the other is kept as cold standby. At times when the operative unit stops working due to some breakdown/failure, the standby unit instantaneously becomes operative while the repairman repairs the failed unit. In this working model, only one unit remains operative at a time. However, there may be a state when both the units fail. The comparison of systems is done by means of MTSF (mean time to system failure), steady state availability and profit function using Laplace transforms and software package Code-Blocks 13.12. Different graphs have been plotted to discover which model is superior to the other model under the given conditions. The system is analysed by making use of semi-Markov processes and regenerative point technique.
منابع مشابه
Fault tolerant system with imperfect coverage, reboot and server vacation
This study is concerned with the performance modeling of a fault tolerant system consisting of operating units supported by a combination of warm and cold spares. The on-line as well as warm standby units are subject to failures and are send for the repair to a repair facility having single repairman which is prone to failure. If the failed unit is not detected, the system enters into an unsafe...
متن کاملPerformance Analysis of a Repairable Robot Safety System with Standby, Imperfect Coverage and Reboot Delay
The present study deals with a robot safety system composed of standby robot units and inbuilt safety unit. When the main operative unit fails, it is replaced by the standby robot unit available in the system. The concept of reboot delay is also incorporated in this study according to which the robot unit is rebooted if it is not successfully recovered. The recovery and reboot times of failed u...
متن کاملReliability Analysis of Redundant Repairable System with Degraded Failure
This investigation deals with the transient analysis of the machine repair system consisting of M-operating units operating under the care of single repairman. To improve the system reliability/availability, Y warm standby and S cold standby units are provided to replace the failed units. In case when all spares are being used, the failure of units occurs in degraded fashion. In such situation ...
متن کاملCost Analysis of a Two-Unit Cold Standby System Considering Hardware, Software Failures and Inspection with Maximum Repair Time
The present paper deals with a reliability model of a two unit cold standby system that exposed to two types of failures. In each unit there are hardware and software componentes work together and fail independently. there is a single server who visits the system immediately when required. The server inspects the unit in case of software failure and decides either to repair or replace it. The h...
متن کاملOn the Reliability of a Renewable Multiple Cold Standby System
Apart from important but particular cases, such as state-dependent exponential distributions, for example, [1, 4] or an arbitrary repair time distribution [12], the reliability analysis of multiple cold standby systems is far from complete. We present a general reliability analysis of a basic multiple cold standby system attended by a single repairman, henceforth called a K-system. The K-system...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره 4 شماره
صفحات -
تاریخ انتشار 2015