Scheduling and Production & Control: MA 27. Scheduling and Production & Control: MA

نویسندگان

  • Pablo Moscato
  • Alexandre Mendes
  • Carlos Cotta
چکیده

This chapter addresses three main problems of the production planning area: Single Machine Scheduling (SMS), Parallel Machine Scheduling (PMS) and Flowshop Scheduling (FS). Many situations in production environments found in industries around the world can be modelled as one or a set of them (Baker 1974). It is easy to find dozens of problem variants in the literature due to different production constraints and objective functions. Due to the overwhelming number of combinations, we focused our discussion on only one of each problem class. They are:

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An imperialist competitive algorithm for solving the production scheduling problem in open pit mine

Production scheduling (planning) of an open-pit mine is the procedure during which the rock blocks are assigned to different production periods in a way that the highest net present value of the project achieved subject to operational constraints. The paper introduces a new and computationally less expensive meta-heuristic technique known as imperialist competitive algorithm (ICA) for long-term...

متن کامل

An application of principal component analysis and logistic regression to facilitate production scheduling decision support system: an automotive industry case

Production planning and control (PPC) systems have to deal with rising complexity and dynamics. The complexity of planning tasks is due to some existing multiple variables and dynamic factors derived from uncertainties surrounding the PPC. Although literatures on exact scheduling algorithms, simulation approaches, and heuristic methods are extensive in production planning, they seem to be ineff...

متن کامل

Reliability Based Maintenance and Human Resources Work-Rest Scheduling in Manufacturing System

In today's competitive market, all manufacturers attempt to improve their maintenance policy in order to decrease the cost of failure and increase the quality of products, but most of these attempts do not consider the role of humans involved in a manufacturing system. Human resources are the main factor in manufacturing that has an undeniable effect on products quality, machines reliability, s...

متن کامل

Single-machine scheduling considering carryover sequence-dependent setup time, and earliness and tardiness penalties of production

Production scheduling is one of the very important problems that industry and production are confronted with it. Production scheduling is often planned in the industrial environments while productivity in production can improve significantly the expansion of simultaneous optimization of the scheduling plan. Production scheduling and production are two areas that have attracted much attention in...

متن کامل

Lot sizing with rework and different inspection costs

This paper deals with the single machine multi-product lot scheduling problem in which defective items are produced in any production run of each product. We have adopted the common cycle scheduling policy and assumed that the setup times for production of each product can be non-zero. Further, we have assumed that defective items will be reworked and the inspection costs during the normal prod...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007