Uncertainty of the PMP and PMF
نویسندگان
چکیده
Jose D. Salas is a professor emeritus of civil and environmental engineering at Colorado State University (CSU). He received BS and civil engineering degrees from the National University of Engineering of Lima, Perú; MSc degree in hydraulics; and PhD degree in hydrology and water resources from CSU. At CSU, he supervised (main advisor) 42 MSc and 37 PhD students. Dr. Salas has been consultant of national and international organizations and worked in several countries sponsored by UNESCO, FAO, AID, IICA, Hydro-Quebec, and the World Bank. Dr. Salas has been member of the editorial board of several international journals and has published extensively in water resources literature including two books and 12 chapters in books and handbooks. He was awarded the 1996 Arid Lands Hydraulic Engineering Award and the 2010 Ven Te Chow Award both by the American Society of Civil Engineers. He is a corresponding member of the Academy of Engineering of Mexico and the Academy of Engineering of Peru.
منابع مشابه
تحلیل عدمقطعیت حداکثر سیلاب محتمل حوضه سد بختیاری به علت عدمقطعیت در مقدار حداکثر بارش محتمل، دمای هوا و آب معادل برف اولیه
اطمینان و اعتبار سیلهای حدی مخصوصا حداکثر سیلاب محتمل (PMF)، بدون در نظرگرفتن منابع عدمقطعیت در برآورد سیل نمیتواند تامین شود. متغیرهای ورودی در مدلهای بارش-رواناب شامل بارش، دمای هوا و آب معادل برف (SWE) اولیه از جمله منابع عدمقطعیت در پیشبینی و برآورد سیل هستند. در این مقاله از روش تئوری مجموعه فازی برای پخش عدمقطعیت مقدار PMP، دمای هوا و آب معادل برف اولیه در برآورد PMF در حوضه سد بختی...
متن کاملبرآورد و تحلیل عدم قطعیت حداکثر سیل محتمل (PMF) با استفاده از رویکرد ترکیبی شبیه سازی مونت کارلو و مدلسازی هیدرولوژیکی
ابعاد خسارات حاصل از سیلابها در سطح جهان، حساسیت بسیار بالای انتخاب سیل طراحی بهمنظور حفظ پایداری این تأسیسات و همچنین هدفگذاری برای کنترل و مدیریت سیلابهای محتمل را نشان میدهد. در این مطالعه، به برآورد و تحلیل عدم قطعیت حداکثر سیل محتمل (PMF) حوضه آبریز رودخانه قمرود با توجه به اهمیت مسئله کنترل سیلاب در این منطقه پرداخته شده است. بدین منظور در برآورد حداکثر سیل محتمل دو رو...
متن کاملDam safety: an evaluation of some procedures for design flood estimation*
This paper analyses a number of aspects related to the estimation of the design flood for a dam. A new approach to the estimation of the probable maximum precipitation (PMP) is described which takes advantage of the spatial variability of precipitation by using radar-derived distributed rainfall measurements. Procedures which utilize storm transposition and storm maximization are introduced to ...
متن کاملReactive planning under uncertainty among moving obstacles
This paper addresses the problem of navigation of complex systems in dynamic environments under uncertainty. Such environments impose a hard real time constraint. However, computing a complete motion to the goal within a limited time is impossible to achieve in most real situations. The Partial Motion Planning (PMP) approach presented in [1] is used to address the planning problem. However, for...
متن کاملبرآورد حداکثر بارش محتمل 24ساعته با دو نگرش آماری هرشفیلد در حوضه آبریز قره سو در استان گلستان
حداکثر بارش محتمل (PMP) و حداکثر سیل محتمل (PMF) از مسائل مهم در طراحی سازههای آبی به شمار میآیند. یکی از مناسبترین روشهای آماری برآورد PMP روش هرشفیلد است. در این مطالعه حداکثر باران 24ساعته با استفاده از اطلاعات 12 تا 53 ساله شش ایستگاه بارانسنجی و یک ایستگاه سینوپتیک واقع در حوضه آبریز قرهسو در استان گلستان مورد بررسی قرار گرفت. به این منظور از دو روش آماری هرشفیلد (در دو نگرش استاندا...
متن کامل