Risk Identification Expert System for Metro Construction Based on Bim

نویسندگان

  • Limao Zhang
  • Xianguo Wu
  • Lieyun Ding
  • Yueqing Chen
  • Miroslaw J. Skibniewski
چکیده

This paper presents a BIM-based Risk Identification Expert System (B-RIES) for metro construction, composed of three main built-in subsystems: BIM extraction, knowledge base management, and risk identification subsystems. The engineering parameter information related to risk factors is extracted from the BIM of a specific project where the IFC standard plays a bridge role between the BIM data and metro construction safety risks. An integrated knowledge base, consisting of fact base, rule base and case base, is established to systematize the fragmented explicit and tacit knowledge. A hybrid inference approach, with case-based reasoning and rule-based reasoning included, is developed to improve the flexibility and comprehensiveness of the system reasoning capacity. During the safety risk identification process, B-RIES is able to improve the inefficiencies in engineering information extraction, reduce the dependence on domain experts, and facilitate knowledge sharing and communication among dispersed clients and domain experts. A typical safety hazard identification in the Mingdu station, located in the Wuhan Metro Line Two, is presented in a case study. The results demonstrate the feasibility of B-RIES, and its application potential. B-RIES can be used as a decision support tool to provide guidelines for safety management in metro construction, and thus increase the likelihood of a successful project in a complex environment.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Real-Time Building Information Modeling (BIM) Synchronization Using Radio Frequency Identification Technology and Cloud Computing System

The online observation of a construction site and processes bears significant advantage to all business sector. BIM is the combination of a 3D model of the project and a project-planning program which improves the project planning model by up to 6D (Adding Time, Cost and Material Information dimensions to the model). RFID technology is an appropriate information synchronization tool between the...

متن کامل

Safety Risks Impacts Analysis on Construction Project Objectives Using a Hybrid Model of Fuzzy Expert System and Latin Hyper Cube Sampling

Background and aims: The construction industry has a high rate of fatal or nonfatal injuries and all around the world which remains one of the most dangerous occupations till now. Since project safety and measuring danger in the construction industry is a crucial subject, so this study aimed to measure the impacts of safety risks on the time and cost objectives of project using a hybrid method ...

متن کامل

A Budgeting Model for the Safety Unit of an Under Construction Metro Station in Tehran Using a Robust Optimization

Background: The construction of metro lines is a high-risk project. Using a budget-based model for the safety units of metro construction projects can help safety managers to spend optimal budget allocation. The purpose of this study was to plan a budget model based on safety unit performance in an under construction metro station for better budget allocation using robust optimization. Methods...

متن کامل

Simulation of Metro Train Fire in an Underground Station of Tehran Metro Line 7

In this research a fire scenario was simulated in one of the stations of the line 7 of Tehran's subway system. The Line 7 is under construction and the ventilation system is under design. Fire was set for a stopping metro train at the platform of the station. A 160 meter length eight-car metro train with the forth wagon on the fire was studied. The heat release rate is based on a quadratic f...

متن کامل

Real Time Safety Risk Analysis of Construction Projects Using Bim and Rtls

The identification of potential accidents on construction sites has been a major concern in the construction industry and it needs a proactive safety plan to reduce the risk of accidents. There are no efficient methods for checking if safety measures are taken properly on construction sites. Consequently, workers on site are not given enough awareness about dangerous areas. In addition, constru...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013