Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology
نویسندگان
چکیده
This paper addresses the problem of scheduling activities in projects with stochastic activity durations. The aim is to determine for each activity a gate—a time before it the activity cannot begin. Setting these gates is analogous to setting inventory levels in the news vendor problem. The resources required for each activity are scheduled to arrive according to its gate. Since activities’ durations are stochastic, the start and finish time of each activity is uncertain. This fact may lead to one of two outcomes: (1) an activity is ready to start its processing as all its predecessors have finished, but it cannot start because the resources required for it were scheduled to arrive at a later time. (2) The resources required for the activity have arrived and are ready to be used but the activity is not ready to start because of precedence constraints. In the first case we will incur a “holding” cost while in the second case, we will incur a “shortage” cost. Our objective is to set gates so as to minimize the sum of the expected holding and shortage costs. We employ the Cross-Entropy method to solve the problem. The paper describes the implementation of the method, compares its results to various heuristic methods and provides some insights towards actual applications.
منابع مشابه
Uncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem
Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...
متن کاملSplittable stochastic project scheduling with constrained renewable resource
This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...
متن کاملA stochastic model for project selection and scheduling problem
Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...
متن کاملA Folding Horizon Approach for Setting Gates of Activities in the Stochastic Project Scheduling Problem
متن کامل
Predetermined intervals for start times of activities in the stochastic project scheduling problem
This paper proposes a new methodology to schedule activities in projects with stochastic activity durations. The main idea is to determine for each activity an interval in which the activity is allowed to start its processing. Deviations from these intervals result in penalty costs. We employ the Cross-Entropy methodology to set the intervals so as to minimize the sum of the expected penalty co...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Annals OR
دوره 172 شماره
صفحات -
تاریخ انتشار 2009