A note on makespan minimization in proportionate flow shops

نویسندگان

  • Byung-Cheon Choi
  • Joseph Y.-T. Leung
  • Michael Pinedo
چکیده

We consider two generalizations of the proportionate flow shop scheduling problem with the makespan objective. Each job has a processing requirement and each machine has a characteristic value. In our first (second) case we assume that the time a job occupies a machine is the maximum (minimum) of the processing requirement of the job and the characteristic value of the machine. We show that the first case is NP-hard in the ordinary sense for three machines. For the second case we show that the makespan is a constant that is independent of the sequence even if the number of machines is larger than three.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Makespan Minimization in No-Wait Flow Shops: A Polynomial Time Approximation Scheme

We investigate the approximability of no-wait permutation flow shop scheduling problem under the makespan criterion. We present a polynomial time approximation scheme (PTAS) for problem on any fixed number of machines.

متن کامل

A Heuristic to Minimize Makespan in Proportional Parallel Flow Shops

This paper addresses the problem of minimizing the makespan on a two-stage parallel flow shops with proportional processing times. The problem of scheduling n independent jobs on m proportional parallel flow shops to minimize makespan is known to be NP-hard and hence too difficult to solve in polynomial time. A multiphase heuristic algorithm to minimize the makespan on two proportional parallel...

متن کامل

Makespan Minimization in Job Shops: A Linear Time Approximation Scheme

In this paper we present a linear time approximation scheme for the job shop scheduling problem with fixed number of machines and fixed number of operations per job. This improves on the previously best 2 + ǫ, ǫ > 0, approximation algorithm for the problem by Shmoys, Stein, and Wein. Our approximation scheme is very general and it can be extended to the case of job shop scheduling problems with...

متن کامل

The flow shop problem with no-idle constraints: A review and approximation

The makespan minimization problem in flow shops with no-idle constraints on machines is considered. The latter means that each machine, once started, must process all its operations without intermediate idle time until all those operations are completed. The problem is known to be strongly NP-hard already for three machines. While being based on a geometrical approach, we propose several polyno...

متن کامل

An Effective Hybrid Genetic Algorithm for Hybrid Flow Shops with Sequence Dependent Setup Times and Processor Blocking

Hybrid flow-shop or flexible flow shop problems have remained subject of intensive research over several years. Hybrid flow-shop problems overcome one of the limitations of the classical flow-shop model by allowing parallel processors at each stage of task processing. In many papers the assumptions are generally made that there is unlimited storage available between stages and the setup times a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Inf. Process. Lett.

دوره 111  شماره 

صفحات  -

تاریخ انتشار 2010