Total completion time minimization in a 2-stage differentiation flowshop with fixed sequences per job type

نویسندگان

  • Bertrand M. T. Lin
  • Feng-Jang Hwang
چکیده

Article history: Received 27 January 2010 Received in revised form 22 September 2010 Accepted 25 November 2010 Available online 30 November 2010 Communicated by Wen-Lian Hsu

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Two-stage assembly-type flowshop batch scheduling problem subject to a fixed job sequence

This paper discusses a two-stage assembly-type flowshop scheduling problem with batching considerations subject to a fixed job sequence. The two-stage assembly flowshop consists of m stage-1 parallel dedicated machines and a stage-2 assembly machine which processes the jobs in batches. Four regular performance metrics, namely, the total completion time, maximum lateness, total tardiness, and nu...

متن کامل

A Flexible Flowshop Scheduling Problem with Machine Eligibility Constraint and Two Criteria Objective Function

This research deals with a flexible flowshop scheduling problem with arrival and delivery of jobs in groups and processing them individually. Due to the special characteristics of each job, only a subset of machines in each stage is eligible to process that job. The objective function deals with minimization of sum of the completion time of groups on one hand and minimization of sum of the diff...

متن کامل

An Iterated Greedy Algorithm for the Flowshop Problem with Sequence Dependent Setup Times

The flowshop problem (FSP) is one of the most thoroughly studied scheduling problems. In the FSP, a set N = {1, . . . , n} of n independent jobs has to be processed on a set M = {1, . . . ,m} of m machines. Every job j, j ∈ N , requires a given fixed, non-negative processing time pij on every machine i, i ∈ M . In a flowshop, all n jobs are to be processed on the m machines in the same order, t...

متن کامل

Solving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm

In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...

متن کامل

Appling Metaheuristic Algorithms on a Two Stage Hybrid Flowshop Scheduling Problem with Serial Batching (RESEARCH NOTE)

In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is investigated. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job in the batch. The analysis and implementation of the prohibited transference of jobs among th...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Inf. Process. Lett.

دوره 111  شماره 

صفحات  -

تاریخ انتشار 2011