Delays and Cost Overruns in Infrastructure Projects: An Enquiry into Extents, Causes and Remedies
نویسنده
چکیده
Media reports abound on instances of prolonged delays and excessive cost overruns in infrastructure projects. Only a small number of projects get delivered in time and within the budget. Examples of successful project implementation, like construction of the Delhi Metro Rail, are few and appear only far in between. Indeed, the problem of time and cost overruns in India is widespread and severe. Yet, very few empirical studies exist on the subject. Even rarer are the studies based on completed projects. As a result, the extents as well as the causes behind delays and cost overruns have remained under-researched. This study investigates the various issues related to delays and cost overruns in publically funded infrastructure projects. The following questions are posed and answered: How common and how large are the time and the cost overruns? What are the essential causes behind these delays and cost overruns? Are the underlying causes statistically significant? Are Contractual and Institutional failures among the significant causes? What are the policy implications for planning, development and implementation of infrastructure projects? The study is based on, by far, the largest dataset of 894 projects from seventeen infrastructure sectors. Among other results, it shows that the contractual and the institutional failures are economically and statistically significant causes behind cost and time overruns.
منابع مشابه
Delays and cost increases in the construction of private residential projects in Kuwait
Time-delays and cost-increases associated with the construction of private residential projects in the State of Kuwait are determined. A person-interview survey of 450 randomly selected private residential project owners and developers in 27 representative districts in metropolitan Kuwait formed the database for the study. The socio-economic traits of the owners/developers, and the pre-construc...
متن کاملSurvival of the unfittest: why the worst infrastructure gets built—and what we can do about it
The article first describes characteristics of major infrastructure projects. Second, it documents a much neglected topic in economics: that ex ante estimates of costs and benefits are often very different from actual ex post costs and benefits. For large infrastructure projects the consequences are cost overruns, benefit shortfalls, and the systematic underestimation of risks. Third, implicati...
متن کاملAssessment of delays and cost overruns during construction projects in Pakistan
Construction projects are commonly delayed due to price escalation of building materials and faulty management in Pakistan. This research paper focused on the main reasons of delay and cost overruns. This research activity was exclusively assessed through questionnaire survey, interviews, field visits and discussion to the concerned authorities. A preplanned survey was conducted through a quest...
متن کاملInvestigation of Significant Factors Influencing Time and Cost Overruns in Indian Construction Projects
Time overruns and Cost overruns has been a major issue in many Indian construction projects. The successful execution of construction projects and keeping them within prescribed schedule and cost is very important for effective time performance and cost performance. This research work is carried out on studying significant factors causing Time overruns and Cost overruns in Indian construction p...
متن کاملAn Investigation into the Risk of Construction Projects Delays in the UAE
The growing rate of delays in project delivery is considered a major criticism of the construction companies in the United Arab Emirates (UAE). This paper aims to investigate the causes and effects behind the delays pertaining to delivery of construction projects in the UAE. The study is exploratory in nature, and incorporates a pilot questionnaire survey and interviews. An extensive literature...
متن کامل