Maintenance Staff Scheduling at Afam Power Station

نویسنده

  • H. K. Alfares
چکیده

This paper describes the optimization of maintenance workforce scheduling at Afam power station in Nigeria. The objective is to determine the optimum schedule to satisfy growing maintenance labour requirements with minimum cost and highest efficiency. Three alternative maintenance workforce schedules are compared. The first alternative is to continue with the traditional five-day workweek schedule currently being practiced by Afam power station maintenance line. The second alternative is to switch to a seven-day workweek schedule for the morning shift only. The third alternative is to use a seven-day workweek schedule for all three work shifts. The third alternative is chosen, as it is expected to save 11% of the maintenance labour cost.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Power Plant Maintenance Scheduling using Dependency Structure Matrix and Evolutionary Optimization

With the growth of demand for electrical energy, it is a common practice in the power industry to shorten the maintenance duration and often to postpone maintenance tasks. Maintenance or overhaul of generating units is one of the crucial factors in delivering reliable electrical energy. A large part of the overhaul work is to examine the condition of the mechanical and the electrical elements. ...

متن کامل

Reliability Based Optimal Preventive Maintenance Policy for High Voltage Circuit Breakers in Power Plants

  Electric power industry have always try to provide reliable electricity to customers and at the same time decrease system costs. High Voltage circuit-breakers are an essential part of the power network. This study has developed a maintenance and replacement scheduling model for high voltage circuit- breakers that minimize maintenance costs while maintaining the acceptable reliability. This mo...

متن کامل

Scheduling United States Coast Guard helicopter deployment and maintenance at Clearwater Air Station, Florida

To mitigate the effects of a corrosive operating environment, the Coast Guard has planned an extensive preventative maintenance program for its Sikorsky HH60J helicopters based on helicopter flight time. We construct a mixed integer linear program that schedules the weeks during which each helicopter undergoes maintenance, as well as the weeks during which a helicopter conducts operations eithe...

متن کامل

Long Term Cost Effective Preventive Maintenance Scheduling

Preventive maintenance scheduling of generating units is addressed as a long-term scheduling in power system studies aiming to increase the reliability incorporating cost reduction. It consists of knowing which generating units should be shut down for regular safety inspection. In this paper, a new formulation of preventive maintenance scheduling associated with cost reduction index (CRI) is pr...

متن کامل

Ant colony optimization for power plant maintenance scheduling optimization - a five-station hydropower system

A number of algorithms have been developed for the optimization of power plant maintenance schedules. However, the true test of such algorithms occurs when they are applied to real systems. In this paper, the application of an Ant Colony Optimization formulation to a hydropower system is presented. The formulation is found to be effective in handling various constraints commonly encountered in ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007