Simulation Modeling of an Iron Ore Operation to Enable Informed Planning

نویسندگان

  • Eli Cohen
  • J. E. Everett
چکیده

An iron ore mining company, operating in Western Australia, trucks ore from three geographically isolated sources to a crusher, where it is blended before and during crushing. The company prides itself on its key performance indicator: the relatively low inter-shipment grade variability of its products. The company has been considering alternative production process designs for all stages from mining to ship loading to improve efficiency and reduce costs. Currently product grade variability is well controlled and it is important not to jeopardize the company’s reputation for grade reliability. However, the company needs to identify potential efficiencies, reduced costs, and alternative product control systems for potential future expansions. Many process design options from mine face to ship loading must be compared and evaluated, with emphasis on maintaining or improving on current grade variability in final shipments. Pilot studies are infeasible, while complex interactions, competing goals, and numerous system configurations make theoretical analysis unmanageable. Real system trials require strong prior probability of success, particularly where product variability to customers is concerned. Simulation studies provide a suitable method to evaluate and compare process design alternatives. This paper describes successful simulation modeling of grade variability. The work provides users with easily run Excel models, tailor-made for specific process designs, using Visual Basic macros and graphical output, to explore the implications of decision parameter choice, under a range of possible operating conditions and ore variability. The models have been designed in modular form for the user to interconnect, simulating different configurations of the mine to ship system, to help make informed decisions as to potential system modification. Construction of input mine grade data is a major first step. Meaningful results require input data maintain the correlations, present in the real production environment, between the mineral components, production linkages, and across time. Mining data from real operations are therefore used, with the means and variability adjusted to match potential development proposals. The studies simulate only short-term variability. Long-term variability should not be controlled by the process design but rather by longer-term ore extraction plans and ultimately resource availability. It is therefore necessary to filter out medium and long-term variations from the production data before use in the simulation model. A Fourier transform technique to do this is described.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Application of truncated gaussian simulation to ore-waste boundary modeling of Golgohar iron deposit

Truncated Gaussian Simulation (TGS) is a well-known method to generate realizations of the ore domains located in a spatial sequence. In geostatistical framework geological domains are normally utilized for stationary assumption. The ability to measure the uncertainty in the exact locations of the boundaries among different geological units is a common challenge for practitioners. As a simple a...

متن کامل

Analyzing the effect of ore grade uncertainty in open pit mine planning; A case study of Rezvan iron mine, Iran

Due to uncertain nature of grade in ore deposits, considering uncertainty is inevitable in geological modelling of resources and mine planning. In other words, uncertainty in grade of mineralized materials, is one of the most significant parameters need attention in mine planning. In this paper, a comparative procedure utilizing Sequential Gaussian Simulation (SGS) and traditional Ordinary Krig...

متن کامل

Assessment of an ore body internal dilution based on multivariate geostatistical simulation using exploratory drill hole data

Dilution can best be defined as the proportion of waste tonnage to the total weight of ore and waste in each block. Predicting the internal dilution based on geological boundaries of waste and ore in each block can help engineers to develop more reliable long-term planning designs in mining activities. This paper presents a method to calculate the geological internal dilution in each block and ...

متن کامل

Detection of Zones Based on Ore and Gangue Using Fractal and Multivariate Analysis in Chah Gaz Iron Ore Deposit, Central Iran

Detection of mineralized zones based on ores and gangues is important for mine planning and excavation operation. The major goal of this research work was to determine the zones based on ores and gangues by a combination of fractal and factor analysis in the Chah Gaz iron ore (Central Iran). The Concentration-Volume (C-V) fractal method was carried out for Fe, P and S, which indicated that the ...

متن کامل

Planning an Iron Ore Mine: From Exploration Data to Informed Mining Decisions

The process of developing an iron ore mine from exploration data through to informed mining decisions provides an example of a Complex Adaptive System. The detailed composition of an ore body (expressed as a “block model” of regularly spaced rectangular blocks) has to be estimated from initially sparse exploration data, based upon a limited number of drill holes. As planning proceeds, the data ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010