How to Value Sky's Intangible Assets? Conceptual Framework: Working Draft a Report Prepared for Ofcom by Oxera Sky's Comments and Queries
نویسنده
چکیده
In general, it is neither (a) determinative on these matters, typically simply proposing different options for addressing them, nor (b) complete in its discussion of the significant number of complex conceptual and measurement issues (some of which are outlined in the attached note from Professor Grout) raised by a proposal to undertake analysis of this nature. In these circumstances, it is our view that it would be a more productive use of Sky’s resources, and ultimately of more assistance to Ofcom, to wait until Oxera has considered these matters in somewhat more detail.
منابع مشابه
Assessment of Sky’s profitability and cost of capital
This is the non-confidential version. Confidential information has been redacted. Redactions are indicated by [ ]. Pay TV statement – Annex 3 – non-confidential version Contents Section Page 1 Introduction 1 2 The use of IRR in profitability analysis 7 3 Have Sky's returns exceeded its cost of capital? 12 4 Why have Sky's returns exceeded its cost of capital? 16 5 Are Sky's returns likely to ...
متن کاملCorporate Reporting of Intangible Assets: A Progress Report
At its last meeting, the Committee agreed to contribute to the Organisation's two-year horizontal project on New Sources of Growth: Intangible Assets, with a report covering the reporting of intangible assets (IA) and progress made in this area in recent years. This report provides an update on the nature and quality of reporting on intangible capital in member countries, building on prior work...
متن کاملHow much should nurse consultants be paid?
There was no consensus on the issue of how much nurse consultants should be paid among the practitioners we spoke to at last week's UKCC roadshow. Some suggested starting salaries of around £25,000, and others said 'the sky's the limit'.
متن کاملBennington, Vermont Prepared by Barr Engineering for Saint-gobain Performance Plastics
Below are the initial comments of the Vermont Agency of Natural Resources (VT ANR) on the “Draft Interim Conceptual Site Model Site Investigation Report; Bennington, Vermont-December 2017,” prepared by Barr Engineering (Barr) for Saint-Gobain Performance Plastics. For the remainder of the comments the above-referenced report will be referred to as the SI report. VT ANR is sending you these comm...
متن کاملA framework of intangible valuation areas (FIVA): Aligning business strategy and intangible assets
Purpose – This study investigates the adequacy of existing intangible asset models and defines and codifies common principal valuation drivers of intangible assets for use in enterprise balanced scorecard valuation practices of information technology (IT) firms. Design/methodology/approach – Existing intangible asset balance scorecard valuation models and value chain models are evaluated to ext...
متن کامل