Dynamic Scheduling of Parallel Real-Time Jobs by Modelling Spare Capabilities in Heterogeneous Clusters
نویسندگان
چکیده
In this research, a scenario is assumed where periodic real-time jobs are being run on a heterogeneous cluster of computers, and new aperiodic parallel real-time jobs, modelled by Directed Acyclic Graphs (DAG), arrive at the system dynamically. In the scheduling scheme presented in this paper, a global scheduler situated within the cluster schedules new jobs onto the computers by modelling their spare capabilities left by existing periodic jobs. Admission control is introduced so that new jobs are rejected if their deadlines cannot be met under the precondition of still guaranteeing the real-time requirements of existing jobs. Each computer within the cluster houses a local scheduler, which uniformly schedules both periodic job instances and the subtasks in the parallel realtime jobs using an Early Deadline First policy. The modelling of the spare capabilities is optimal in the sense that once a new task starts running on a computer, it will utilize all the spare capability left by the periodic real-time jobs and its finish time is the earliest possible. The performance of the proposed modelling approach and scheduling scheme is evaluated by extensive simulation; results show that the system utilization is significantly enhanced, while the real-time requirements of the existing jobs remain guaranteed.
منابع مشابه
Dynamic, capability-driven scheduling of DAG-based real-time jobs in heterogeneous clusters
In this research a scenario is assumed where periodic real-time jobs are being run on a heterogeneous cluster of computers, and new aperiodic parallel real-time jobs, modelled by Directed Acyclic Graphs (DAG), arrive at the system dynamically. In the scheduling scheme presented in this paper, a global scheduler situated within the cluster schedules new jobs onto the computers by modelling their...
متن کاملA Dynamic and Reliability-Driven Scheduling Algorithm for Parallel Real-time Jobs on Heterogeneous Clusters
In this paper, a heuristic dynamic scheduling scheme for parallel real-time jobs executing on a heterogeneous cluster is presented. In our system model, parallel real-time jobs, which are modeled by directed acyclic graphs, arrive at a heterogeneous cluster following a Poisson process. A job is said to be feasible if all its tasks meet their respective deadlines. The scheduling algorithm propos...
متن کاملSolving the Problem of Scheduling Unrelated Parallel Machines with Limited Access to Jobs
Nowadays, by successful application of on time production concept in other concepts like production management and storage, the need to complete the processing of jobs in their delivery time is considered a key issue in industrial environments. Unrelated parallel machines scheduling is a general mood of classic problems of parallel machines. In some of the applications of unrelated parallel mac...
متن کاملSolving the Problem of Scheduling Unrelated Parallel Machines with Limited Access to Jobs
Nowadays, by successful application of on time production concept in other concepts like production management and storage, the need to complete the processing of jobs in their delivery time is considered a key issue in industrial environments. Unrelated parallel machines scheduling is a general mood of classic problems of parallel machines. In some of the applications of unrelated parallel mac...
متن کاملDynamic scheduling of a batch of parallel task jobs on heterogeneous clusters
0167-8191/$ see front matter 2011 Elsevier B.V doi:10.1016/j.parco.2010.12.004 ⇑ Corresponding author. Tel.: +351 22 508 18 88. E-mail addresses: [email protected] (J.G. Barbosa This paper addresses the problem of minimizing the scheduling length (make-span) of a batch of jobs with different arrival times. A job is described by a direct acyclic graph (DAG) of parallel tasks. The paper proposes ...
متن کامل