Developing a framework for statistical process control approaches in project management
نویسندگان
چکیده
Different statistical process control (SPC) approaches were proposed over the years for project management using earned value management/ earned schedule. A detailed examination of these approaches has led us to express a need for a unified framework in which to test and compare them. The main drivers for this need were the lack of a formal definition for a state of control, the unavailability of a benchmark dataset, the absence of measures to quantify the SPC performance and the lack of consensus on how to overcome and test the normality assumption. In this paper, we present such a framework that combines a classification from empirical data, a known project dataset, a sound simulation model and two quantitative measures for project control efficiency. Four SPC approaches from prior literature have been implemented and an exhaustive experiment was set up to compare and to discuss their value for the project management practice. © 2015 Elsevier Ltd. APM and IPMA. All rights reserved.
منابع مشابه
Introducing a Project Management Framework for Transfer of Technologies
This paper aims at emphasizing the importance of establishing a Project Management (PM) system in Technology Transfer (TT) processes and developing a conceptual framework for it. TT is an important process in Technology Management affairs for all enterprises. Most of the time, lack of a particular concentration on technical, commercial and legal aspects of TT process, leads to mismanagement of...
متن کاملResilient Project Management, A New Approache to Develop Project Management Knowledge (Case Study: Infrastructure Civil Projects Management)
Accepetance of the fact that the working context of civil projects is challenging can enhance the resiliency capacity and will increase the project management concentration for improving and developing the software and hardware capabilities to facilitate project success achievement. This article is documented based on a research results in macro-hydropower plants projects management context to ...
متن کاملProcess Capability Studies in an Automated Flexible Assembly Process: A Case Study in an Automotive Industry
Statistical Process Control (SPC) methods can significantly increase organizational efficiency if appropriately used. The primary goal of process capability studies is to obtain critical information about processes to render them even more effective. This paper proposes a comprehensive framework for proper implementation of SPC studies, including the design of the sampling procedure and interva...
متن کاملSelf-Starting Control Chart and Post Signal Diagnostics for Monitoring Project Earned Value Management Indices
Earned value management (EVM) is a well-known approach in a project control system which uses some indices to track schedule and cost performance of a project. In this paper, a new statistical framework based on self-starting monitoring and change point estimation is proposed to monitor correlated EVM indices which are usually auto-correlated over time and non-normally distributed. Also, a new ...
متن کاملTowards Measuring the Project Management Process During Large Scale Software System Implementation Phase
Project management is an important factor to accomplish the decision to implement large-scale software systems (LSS) in a successful manner. The effective project management comes into play to plan, coordinate and control such a complex project. Project management factor has been argued as one of the important Critical Success Factor (CSF), which need to be measured and monitored carefully duri...