Utilization of Forest Residue through Combined Heat and Power or Biorefinery for Applications in the Swedish Transportation Sector

ثبت نشده
چکیده

Sweden has the goal of reaching a fossil independent transportation sector by 2030. Two ways to reach the goal is to increase the use of electric vehicles or produce more biofuels. Both alternatives could be powered by forest residue, which is an underutilized resource in the country. Electricity could be produced in a biomass fired Combined Heat and Power (CHP) plant, and biofuel could be produced in a biorefinery through gasification of biomass and Fischer-Tropsch process. When located in Stockholm County, both system can also distribute heat to the district heating system. It is however important to use the biomass in an energyefficient way. The scope of this work has been to analyze the efficiency together with environmental and economic aspects of the two systems. To assess the efficiency and environmental impact of the two systems a forest to wheel study was made of the systems where the product was studied from harvesting of forest residue to driving the vehicle. The studied functional units were: kilometers driven by vehicle, kWh of district heating, CO2-equivalents of greenhouse gases and MWh of forest residue. The system using CHP technology and electric vehicles outperformed the biorefinery system on the two first functional units. Using the same amount of forest residue more than twice as much district heating and almost twice as many driven kilometers were produced in this system. The study also showed that both systems avoids significant greenhouse gas emissions and can be part of the solution to decrease emissions from road transportation. The profitability of investing in a CHP plant or a biorefinery was calculated through the net present value method. It showed that the expected energy prices are too low for the investments to be profitable. The CHP plant investment has a net present value of -1.6 billion SEK and the biorefinery investment has a net present value of -4.6 billion SEK. Furthermore, the biorefinery investment entails higher risk due to the high investment cost and uncommercialized technology. Both systems face barriers for implementation, these barriers have been studied qualitatively.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Review of Membrane Technology for Integrated Forest Biorefinery

More recently, the concept of integrated forest biorefinery (IFBR) has received much attention as a promising solution for the struggling forest industry in North America and Europe to overcome its difficult financial period and competes globally. This new business paradigm offers a broad range of potentially attractive products, from bioenergy to value-added green organic chemicals in addition...

متن کامل

Energy Delivery at Oil and Gas Wells Construction in Regions With Harsh Climate

Energy delivery at well construction in regions with hard climate is distinguished by variable demand in electric and heat power. Energy consumption of drilling equipment, production and living facilities varies greatly during the year, depending on power load charts and climate conditions. Power supply of remote well construction sites is mostly accomplished by operating autonomous power sourc...

متن کامل

Thermodynamic and Exergy Analysis of a Combined Power and Desalination Plant

Making potable water through desalination plants is a very important process in Iran where clean water is highly required. On the other hand, large amount of fossil fuel sources leads to the development of gas turbine power plants all over the country. Furthermore, Persian Gulf in the south and Caspian Sea in the north could be the main sources for supplying potable water in water scarcity area...

متن کامل

The Effects of Electricity Boiler on Integrated CCHP-Thermal-Heat Only Unit Commitment Problem Based on Hybrid GA Approach

Combined cooling, heat, and power (CCHP) units can be integrated with conventional separate cooling, heat, and power production units to meet demands. The goal of this study is to develop and examine a hybrid GA-heuristic optimization algorithm for solving the unit commitment problem for integrated CCHP-thermal-heat only system with considerations for electricity boiler. When environmental emis...

متن کامل

برنامه‌ریزی تولید همزمان انرژی الکتریکی و حرارتی با درنظرگرفتن اثر دریچه‌های بخار و نواحی ممنوعۀ تولید توسط الگوریتم ترکیبی BF-PSO

Combined heat and power production technology has energy efficiency and environmental advantages over other forms of energy supply. Solving combined heat and power economic dispatch problem considering all system demand and operational constraints determines optimal utilization of power and heat sources. In micro grids, dual dependency of combined heat and power production makes economic dispat...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2017