ATC in Competitive Electricity Market Using TCSC

نویسنده

  • G. C. Ejebe
چکیده

In a deregulated power system structure, power producers and customers share a common transmission network for wheeling power from the point of generation to the point of consumption. All parties in this open access environment may try to purchase the energy from the cheaper source for greater profit margins, which may lead to overloading and congestion of certain corridors of the transmission network. This may result in violation of line flow, voltage and stability limits and thereby undermine the system security. Utilities therefore need to determine adequately their available transfer capability (ATC) to ensure that system reliability is maintained while serving a wide range of bilateral and multilateral transactions. This paper presents power transfer distribution factor based on AC load flow for the determination and enhancement of ATC. The study has been carried out for IEEE 24 bus Reliability Test System. Keywords—Available Transfer Capability, FACTS devices, Power Transfer Distribution Factors.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimal Placement of TCSC for Congestion Management using Modified Particle Swarm Optimization

In a competitive power market, the task of an independent system operator (ISO) is to ensure full dispatches of the contracted power are carried out reliably. However, if it threatens the system security then ISO makes decision on the re-dispatch of the contracted power i.e., Congestion Management (CM). This paper proposes an optimal congestion management approach in a deregulated electricity m...

متن کامل

Optimal Location of Tcsc and Svc for Atc Enhancement in a Deregulated Environment Using Real Genetic Algorithm

Improving of ATC is an important issue in the current de-regulated environment of power systems. The Available Transfer Capability (ATC) of a transmission network is the unutilized transfer capabilities of a transmission network for the transfer of power for further commercial activity, over and above already committed usage. Power transactions between a specific seller bus/area and a buyer bus...

متن کامل

Optimal Location of Thyristor-controlled-series- capacitor using Min Cut Algorithm

Existence of many different Operators in the new electricity has brought many challenges in the system operation and control to obtain minimum generation cost and security. With the growing demand of electricity in the competitive electricity market environment, one or more transmission lines could be overloaded, therefore causing congestion. The congestion can be eliminated/alleviated by impro...

متن کامل

Optimal Allocation of FACTS Devices in Deregulated Electricity Market Using Bees Algorithm

In this paper, a novel method using Bees Algorithm is proposed to determine the optimal allocation of FACTS devices for maximizing the Available Transfer Capability (ATC) of power transactions between source and sink areas in the deregulated power system. The optimizations are made on three parameters: the location of the devices, their types and their sizes. The FACTS devices are located in or...

متن کامل

IMPLEMENTATION of TCSC in CONGESTION MANAGEMENT

Competition is on rise in generation and distribution, which results huge transactions. Nonetheless, transmission lines are overloaded, since transmission system provides access of electricity having limited corridors. Consequently, the probability of congestion tends to be prominent. Congestion in transmission corridors not only causes collapse of that particular area but affects other area as...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014