Dynamic Drum-Buffer-Rope approach for production planning and control in capacitated flow-shop manufacturing systems

نویسندگان

  • Patroklos Georgiadis
  • Alexandra Politou
چکیده

Drum-Buffer-Rope-based production planning and control (PPC) approaches provide production managers with effective tools to manage production disruptions and improve operational performance. The corner stone of these approaches is the proper selection of time-buffers which are considered as exogenously defined constant. However, the majority of real-world manufacturing systems are characterized by the dynamic change of demand and by stochastic production times. This fact calls for a dynamic approach in supporting the decision making on time-buffer policies. To this end, we study a capacitated, single-product, three-operation, flow-shop manufacturing system. We propose a dynamic time-buffer control mechanism for short/medium-term PPC with adaptive response to demand changes and robustness to sudden disturbances in both internal and external shop environment. By integrating the control mechanism into the flow-shop system, we develop a system dynamics model to support the decision-making on time-buffer policies. Using the model, we study the effect of policies on shop performance by means of analysis of variance. Extensive numerical investigation reveals the insensitivity of time-buffer policies to key factors related to demand, demand due date and operational characteristics such as protective capacity and production times. 2013 Elsevier Ltd. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Improving for Drum_Buffer_Rope material flow management with attention to second bottlenecks and free goods in a job shop environment

Drum–Buffer–Rope is a theory of constraints production planning methodology that operates by developing a schedule for the system’s first bottleneck. The first bottleneck is the bottleneck with the highest utilization. In the theory of constraints, any job that is not processed at the first bottleneck is referred to as a free good. Free goods do not use capacity at the first bottleneck, so very...

متن کامل

Production Planning and Control in Flow Shop Operations using Drum Buffer Rope Methodology: A System Dynamics Approach

This paper aims to introduce System Dynamics (SD) in applying Drum Buffer Rope (DBR) methodology of Theory of Constraints (TOC) in a three-stage flow shop system that produces a single product. To the best of our knowledge, although there are a lot of TOC applications using discrete simulation in production scheduling with DBR methodology, there are not any TOC application of DBR methodology in...

متن کامل

A novel mathematical model for a hybrid flow shop scheduling problem under buffer and resource limitations-A case study

Scheduling problems play a big role in manufacturing and planning the production for increasing the production efficiency and assigning the resources to operations. Furthermore, in many manufacturing systems there is a physical space between stages that called intermediate buffers. In this study, a model is proposed for minimizing the makespan of a hybrid flow shop scheduling problem with inter...

متن کامل

Using simplified drum-buffer-rope for re-entrant flow shop scheduling in a random environment

The traditional simplified drum buffer rope (SDBR) does not consider the application of re-entrant flow shop (RFS) in a random environment which might involve variable processing times and machine breakdowns. This paper proposed a weighted layer production buffer and weighted production buffer to monitor the status of the buffer deviation when applying SDBR in a RFS with non-deterministic param...

متن کامل

A Multi-Objective Optimization Approach Using Genetic Algorithms for Quick Response to Effects of Variability in Flow Manufacturing

This paper exemplifies a framework for development of multi-objective genetic algorithm based job sequencing method by taking account of multiple resource constraints. Along this, Theory of Constraints based Drum-Buffer-Rope methodology has been combined with genetic algorithm to exploit the system constraints. This paper introduces the Drum-Buffer-Rope to exploit the system constraints, which ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Computers & Industrial Engineering

دوره 65  شماره 

صفحات  -

تاریخ انتشار 2013