On Just-In-Time Production Leveling
نویسندگان
چکیده
منابع مشابه
A REVIEW ON SEQUENCING APPROACHES FOR MIXED-MODEL JUST-IN-TIME PRODUCTION SYSTEM
Research interests have been focused on the concept of penalizing jobs both for being early and for being tardy because not only of modern competitive industrial challenges of providing a variety of products at a very low cost by smoothing productions but also of its increasing and exciting computer applications. Here, sequencing approaches of the mixed- model just-in-time production systems is...
متن کاملA Mathematical Programming Model for Flow Shop Scheduling Problems for Considering Just in Time Production
In this paper, we consider a flow shop scheduling problem with bypass consideration for minimizing the sum of earliness and tardiness costs. We propose a new mathematical modeling to formulate this problem. There are several constraints which are involved in our modeling such as the due date of jobs, the job ready times, the earliness and the tardiness cost of jobs, and so on. We apply adapte...
متن کاملResource Leveling in Make-to-Order Production: Modeling and Heuristic Solution Method
We consider the mid-term production planning problem in make-to-order production, which consists in scheduling production orders so that the variability in the resource utilization over time is minimized. The problem is modeled as a resource leveling project scheduling problem, where production orders for final products and main components correspond to activities of a project. We present a ne...
متن کاملLeveling of Low Volume and High Mix Production based on a Group Technology Approach
Production leveling is an essential element of the Toyota Production System. It aims at balancing production volume as well as production mix to reduce waste, overburden, and unevenness. The application of conventional leveling approaches is limited by the requested product diversity. Because of this production leveling is predominantly used in high volume production. Nevertheless it can be imp...
متن کاملBi-objective Optimization for Just in Time Scheduling: Application to the Two-Stage Assembly Flow Shop Problem
This paper considers a two-stage assembly flow shop problem (TAFSP) where m machines are in the first stage and an assembly machine is in the second stage. The objective is to minimize a weighted sum of earliness and tardiness time for n available jobs. JIT seeks to identify and eliminate waste components including over production, waiting time, transportation, inventory, movement and defective...
متن کامل