A cross-scale models interoperability problem: the Plate- Form(E)3 project case study

نویسندگان

  • Alexis Aubry
  • Jean Noël
  • Daniel Rahon
  • Hervé Panetto
چکیده

This paper presents the Plate-Form(E)3 project which is funded by the French National Research Agency (ANR) as a case study highlighting cross-scale models interoperability problems. This project involves public and private French organisations. It deals with the specification of a software platform for computing and optimising the energetic and environmental efficiency for industries and territories. Its aim is the integration of specialised tools for analysing sustainability of any processes. One important topic addressed by this project concerns the interoperability issues when interconnecting these tools (for modelling, simulating, and optimising) into the platform at different modelling scales (territory/plant/process/component). This paper proposes to highlight the interoperability issues led by the heterogeneity of the related tools in the energetic and environmental efficiency context.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Cross-Scale Models Interoperability Problem: The Plate-Form(E)3 Project Case Study - Short Paper

This paper presents the Plate-Form(E)3 project which is funded by the French National Research Agency (ANR) as a case study highlighting cross-scale models interoperability problems. This project involves public and private French organisations. It deals with the specification of a software platform for computing and optimising the energetic and environmental efficiency for industries and terri...

متن کامل

The resource-constraint project scheduling problem of the project subcontractors in a cooperative environment: Highway construction case study

Large-scale projects often have several activities which are performed by subcontractors with limited multi-resources. Project scheduling with limited resources is one of the most famous problems in the research operations and optimization cases. The resource-constraint project scheduling problem (RCPSP) is a NP-hard problem in which the activities of a project must be scheduled to reduce the p...

متن کامل

Toward an interoperable software platform for sustainable energy

A draft architecture of a software platform is proposed to support software components interoperability in energy production systems. The scope of the platform is to address the sustainability of energy production and use efficiency. A first prototype of this platform is under development in the framework of the French ANR Plate-Form(E)3 project. Interoperability issues have been faced to desig...

متن کامل

A stochastic model for project selection and scheduling problem

Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...

متن کامل

A Comprehensive Study of Several Meta-Heuristic Algorithms for Open-Pit Mine Production Scheduling Problem Considering Grade Uncertainty

It is significant to discover a global optimization in the problems dealing with large dimensional scales to increase the quality of decision-making in the mining operation. It has been broadly confirmed that the long-term production scheduling (LTPS) problem performs a main role in mining projects to develop the performance regarding the obtainability of constraints, while maximizing the whole...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013