Development of a Resource Classification Framework for Old Landfills in Flanders (project Reclaf)
نویسندگان
چکیده
Within the project RECLAF (Resource Classification Framework for Old Landfills in Flanders) the resource recovery potential of approximately 2,000 historic landfills in Flanders is prospected. The research project’s goal is to systematically provide information for the future management of these former landfill sites, e.g. whether the sites are to be mined or not and under which conditions. Therefore, a consistent and practical classification framework including an evaluation tool is tailored to the specific Flemish situation. Similar to techniques used in the mining industry, this tool is capable to prioritize potential extraction projects by labeling the landfilled materials as either ‘reserves’ (current economic extraction confirmed) or ‘resources’ (reasonable prospects for economic extraction in the foreseeable future) or none of both, and to reveal critical factors for the classification of the project. In the presented case study the socioeconomic viability of mining an old landfill close to Antwerp is evaluated. In a first step, relevant material and energy flows are quantified in a Material Flow Analysis. In a second step, a Discounted Cash Flow analysis is performed from a public entity’s perspective, considering direct monetary effects (i.e. costs for excavating, transporting, processing materials and the disposal of residues, revenues for selling secondary products and avoided aftercare costs) as well as some selected non-monetary or indirect financial effects. Potential greenhouse gas emission savings of a landfill-mining project compared to a “Do-Nothing” scenario are monetized via a hypothetical CO2 tax. Further, the prevented pollution of soil, ground and surface water due to landfill mining is included via avoided aftercare costs. In addition, after selling the clean regained land, revenues from annual land tax are incorporated as indirect financial long-term effects for municipalities.
منابع مشابه
An Integrated Human Resource Planning Framework for Project-based Organizations in Oil and Gas Industry
The complexities of the oil industry, combined project-based organizations’ complexities, have led the traditional planning of HR being failed. The success of these organizations is based on integrative human resource planning. To this end, the purpose of this study was to determine the factors and components of human resource planning in oil and gas project-based organizations and providing an...
متن کاملAN EFFECTIVE METHOD FOR SIMULTANEOUSLY CONSIDERING TIME-COST TRADE-OFF AND CONSTRAINT RESOURCE SCHEDULING USING NONLINEAR INTEGER FRAMEWORK
Critical Path Method (CPM) is one of the most popular techniques used by construction practitioners for construction project scheduling since the 1950s. Despite its popularity, CPM has a major shortcoming, as it is schedule based on two impractical acceptance that the project deadline is not bounded and that resources are unlimited. The analytical competency and computing capability of CPM thus...
متن کاملAn integrated simulation-DEA approach to multi-criteria ranking of scenarios for execution of operations in a construction project
The purpose of this study is to examine different scenarios for implementing operations in the pre-construction phase of a project, based on several competing criteria with different importance levels in order to achieve a more efficient execution plan. This paper presents a new framework that integrates discrete event simulation (DES) and data envelopment analysis (DEA) to rank different scena...
متن کاملDesigning a Meta Model for Strategic Human Resource Development based on the CIIP Framework by Reviewing Previous Studies
This study tended to provide a comprehensive and systematic model for SHRD based on the CIIP model. To this mean, a targeted review of the definitions, frameworks and models of (SHRD) was carried out. The research method was qualitative meta-synthesis. For data collection, secondary data sources called previous documents were explored. The method of data analysis was a combination of quantitati...
متن کاملA Genetic Algorithm and a Model for the Resource Constrained Project Scheduling Problem with Multiple Crushable Modes
Abstract: This paper presents an exact model and a genetic algorithm for the multi-mode resource constrained project scheduling problem with generalized precedence relations in which the duration of an activity is determined by the mode selection and the duration reduction (crashing) applied within the selected mode. All resources considered are renewable. The objective is to determine a mode, ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2016