Recent Developments on Beam Observations at Srrc
نویسندگان
چکیده
In this paper, we will present some recent developed methods of beam observations and their experimental results. These methods including: beam energy measurement by laser Compton scattering, investigating electron beam orbit sensitivities on the flux of the photon beam line, beam lifetime investigation in storage rings.
منابع مشابه
Diagnostics Development in SRRC
There are several new developments in diagnostics at the SRRC. These new developments include an orbit feedback system, tune monitor, filling pattern monitor, timedomain coupled-bunch oscillation monitor, and an improved synchrotron radiation monitor. A global orbit feedback system as well as a local orbit feedback system have been developed to eliminate excursions from the reference orbit that...
متن کاملExperiment of Rf Voltage Modulation at Srrc
The effects of amplitude modulation of RF cavity voltage on the longitudinal beam dynamics were studied experimentally at SRRC by using a streak camera system. The characteristics of parametric resonance in single bunch beam was investigated both by simulation and measurement. The formation of beamlets in the bunch helps to damp the coherent bunch oscillation. This property is employed to provi...
متن کاملCompensation Scheme of Elliptical Polarization from Bending Magnet at SRRC
A prototype elliptical polarization from bending magnet ( EPBM) system with a dynamic local bump has been implemented at the SRRC storage ring. The local bump is created by using two pairs of vertical correctors located on each side of the bending. The bump strength coeffieient was obtained from measured beam response matrix. Disurbance of stored electron beam orbit was boserved while flipping ...
متن کاملUpdate of the Control System at Srrc
The control system of accelerator complex at SRRC work well since its dedication in 1993. Several major upgrade projects will finish in the early of next millennium to improve performance of the light source. Injector of SRRC will run in 1.5 GeV in 2000 with rejuvenated control system that has been integrated to main control system recently. Orbit feedback system is developed to improve orbit s...
متن کاملThe Upgrade of Srrc Booster Extraction System
It is planned to upgrade the SRRC booster from 1.3 GeV to 1.5 GeV for full energy injection into the storage ring before the end of 1999. Based on the technical specification and operation experience, it is concluded that some of the subsystem components need to be rebuilt, such as the magnet power supply systems and beam extraction elements. A review of the power supply system will be reported...
متن کامل