Nuclear Regulatory Commission Environmental Standard Review Plan
ثبت نشده
چکیده
Environmental standard review plans are prepared for the guidance of the Office of Nuclear Reactor Environmental standard review plans are prepared for the guidance of the Office of Nuclear Reactor Environmental standard review plans are prepared for the guidance of the Office of Nuclear Reactor Environmental standard review plans are prepared for the guidance of the Office of Nuclear Reactor Regulation staff responsible for environmental reviews for nuclear power plants. These documents Regulation staff responsible for environmental reviews for nuclear power plants. These documents Regulation staff responsible for environmental reviews for nuclear power plants. These documents Regulation staff responsible for environmental reviews for nuclear power plants. These documents are made available to the public as part of the Commission's policy to inform the nuclear industry and are made available to the public as part of the Commission's policy to inform the nuclear industry and are made available to the public as part of the Commission's policy to inform the nuclear industry and are made available to the public as part of the Commission's policy to inform the nuclear industry and the general public of regulatory procedures and policies. Environmental standard review plans are the general public of regulatory procedures and policies. Environmental standard review plans are the general public of regulatory procedures and policies. Environmental standard review plans are the general public of regulatory procedures and policies. Environmental standard review plans are not substitutes for regulatory guides or the Commission's regulations and compliance with them is not substitutes for regulatory guides or the Commission's regulations and compliance with them is not substitutes for regulatory guides or the Commission's regulations and compliance with them is not substitutes for regulatory guides or the Commission's regulations and compliance with them is not required. The environmental standard review plans are keyed to Preparation of Environmental not required. The environmental standard review plans are keyed to Preparation of Environmental not required. The environmental standard review plans are keyed to Preparation of Environmental not required. The environmental standard review plans are keyed to Preparation of Environmental Reports for Nuclear Power Stations. Published environmental standard review plans will be revised periodically, as appropriate, to Published environmental standard review plans will be revised periodically, as appropriate, to Published environmental standard review plans will be revised periodically, as appropriate, to Published environmental standard review plans will be revised periodically, as appropriate, to accommodate comments and to reflect new information …
منابع مشابه
Significant Hazards Consideration in Support of the Proposed Amendment to the Yankee Power Station Security Plan Relating to Security/Safeguards Measures for Dry Cask Storage
Pursuant to 10 CFR Section 50.90 of the Commission's Rules and Regulations, Yankee Atomic Electric Company (YAEC) requested Nuclear Regulatory Commission (NRC) review and approval of an amendment to the Yankee Nuclear Power Station (YNPS) Security Plan (References (b) and (c)). In support of this request, YAEC hereby submits, in accordance with 10 CFR Section 50.91, the corresponding significan...
متن کاملSTANDARD REVIEW PLAN Office of Nuclear Reactor Regulation
These are modifications to a plant's design, operations or other activities that require NRC approval. These modifications could include items such as exemption requests under 10 CFR 50.11 and license amendments under 10 CFR 50.90. Standard Review plans are prepared for the guidance of the Office of Nuclear Reactor Regulation staff responsible for the review of applications to construct and ope...
متن کاملAssessment of Nuclear Moisture Density Gauges at a Secondary Standard Dosimetry Laboratory in Ghana during December 2015–December 2017
Introduction: Nuclear moisture density gauges are widely used in construction industry in different countries across the world, including Ghana, on a large scale. Like all irradiating devices, the nuclear gauges should be subjected to radiation safety assessment based on radiation protection and safety principles. Regarding this, the objective of this research was to i...
متن کاملIii. Finding of No Significant Impact Nuclear Regulatory Commission Sunshine Act; Meetings Nuclear Regulatory Commission Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations
White Eagle Toxicology Laboratories, Inc. for Materials License No. 37– 30247–01, to authorize release of its facility in Doylestown, Pennsylvania for unrestricted use and has prepared an Environmental Assessment (EA) in support of this action in accordance with the requirements of 10 CFR Part 51. Based on the EA, the NRC has concluded that a Finding of No Significant Impact (FONSI) is appropri...
متن کاملNational Archives and Records Administration Agency Information Collection Activities: Submission for Omb Review; Comment Request; Correction Nuclear Regulatory Commission Sunshine Act Meeting Nuclear Regulatory Commission Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations Background
MATTERS TO BE CONSIDERED: (1) Summary report by President of the Commission on national and regional issues affecting the U.S. Army Corps of Engineers and Commission programs and projects on the Mississippi River and its tributaries; (2) District Commander’s overview of current project issues within the New Orleans District; and (3) Presentations by local organizations and members of the public...
متن کامل