The delta of the River Senegal was modified substantially by the construction of the Diama dam in 1986 and the floodplain and estuarine areas on the Mauritanian bank were affected severely by the absence of floods. In 1994, managed flood releases were initiated in the Bell basin (4000 ha) of the Diawling National Park, as part of a rehabilitation effort. The basin was designated as a joint management area between traditional users and the Park authority and a revised management plan was developed through a participatory approach based on a t opographical, hydro-climatic, ecological and socio-economic data. Hydraulic modelling was developed as a tool to support stakeholder negotiations on the desired characteristics of the managed flood releases. Initially, a water balance model was developed. The data were then integrated into a one-dimensional hydraulic model, MIKE 11 (DHI, 2000). When associated with a Digital Elevation Model and a Geographic Information System, (Arc View), the model provided a dynamic description of floods. Flood extent, water depth and flood duration data were combined with ecological and socio-economic data. The water requirements of the different stakeholders were converted to flood scenarios and the benefits and constraints analysed. A consensus scenario was reached through a participatory process. The volume of flood release required to restore the delta does not affect hydro-power generation, navigation or intensive irrigation, for which the dams in the basin were constructed. Hydraulic modelling provided useful inputs to stakeholder discussions and allows investigation of untested flood scenarios.
منابع مشابه
The restoration of the Lower Delta of the Senegal River, Mauritania (1993-2004) La restauration du bas-delta du fleuve Sénégal, Mauritanie (1994-2003)
— The ecological functioning of the Senegal River estuary and Lower Delta was negatively affected by the construction of the Diama dam in 1986. As from 1994, managed flood releases were used to rehabilitate part of the floodplain and to create an artificial estuary. By simulating the pre-dam hydrodynamics, ecosystem functions were restored. This allowed the local inhabitants to resume their tra...
متن کاملA Bayesian model decision support system: dryland salinity management application
Addressing environmental management problems at catchment scales requires an integrated modelling approach, in which key bio-physical and socio-economic drivers, processes and impacts are all considered. Development of Decision Support Systems (DSSs) for environmental management is rapidly progressing. This paper describes the integration of physical, ecological, and socio-economic components i...
متن کاملLandscape Planning for Conservation, Based on the InVEST Model of Habitat Quality and Ecological Impact Assessment of Road Network in Chaharmahal & Bakhtiari Province
One of the primary goals of conservation portfolio selection approaches is to create a functional landscape or network of sites that can support all elements of biodiversity and minimize the environmental risk to critical habitats and species. As human activities, especially roads network development, can be regarded as one of the most important risk elements for the valuable habitats and s...
متن کاملImpacts of urbanization on net primary productivity in the Pearl River Delta, China
Great changes in land use/land cover from rapid urbanization have occurred in the PearlRiver Delta, China. As the primary cause of land development in the urbanization process,urban expansion has mostly occurred on land with higher NPP, significantly impacting theregional ecosystems. The primary purpose of this study was to reveal the impacts of urbanexpansion on the regional NPP. The land cove...
متن کاملEnvironmental risk assessment of a dam during construction phase
The present study was conducted to assess the possible risks induced by construction of Gavi Dam in Ilam Province; western part of Iran, using MIKE-11 model and technique for order of preference by similarity to ideal solution. For this purpose, vulnerable zone of the dam site against the flooding risk of Gavi River was calculated for different return periods. The flooding zones were stimulated...