Short-term hydropower production planning by stochastic programming

نویسندگان

  • Stein-Erik Fleten
  • Trine Krogh Kristoffersen
چکیده

Within the framework of multi-stage mixed-integer linear stochastic programming we develop a short-term production plan for a price-taking hydropower plant operating under uncertainty. Current production must comply with the day-ahead commitments of the previous day which makes short-term production planning a matter of spatial distribution among the reservoirs of the plant. Day-ahead market prices and reservoir inflows are, however, uncertain beyond the current operation day and water must be allocated among the reservoirs in order to strike a balance between current profits and expected future profits. A demonstration is presented with data from a Norwegian hydropower producer and the Nordic power market at Nord Pool.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Chance Constrained Integer Programming Model for Open Pit Long-Term Production Planning

The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...

متن کامل

Medium Term Hydroelectric Production Planning - A Multistage Stochastic Optimization Model

Multistage stochastic programming is a key technology for making decisions over time in an uncertain environment. One of the promising areas in which this technology is implementable, is medium term planning of electricity production and trading where decision makers are typically faced with uncertain parameters (such as future demands and market prices) that can be described by stochastic proc...

متن کامل

Optimal production strategy of bimetallic deposits under technical and economic uncertainties using stochastic chance-constrained programming

In order to catch up with reality, all the macro-decisions related to long-term mining production planning must be made simultaneously and under uncertain conditions of determinant parameters. By taking advantage of the chance-constrained programming, this paper presents a stochastic model to create an optimal strategy for producing bimetallic deposit open-pit mines under certain and uncertain ...

متن کامل

Optimal Mixture of Electricity Production Under Uncertainty: Case of Western Azerbaijan Province

In recent years, optimal use of fossil fuels, reduction of environmental pollution and exploitation of renewable energy is one of the most important issues in the policies of different countries, and as you know, Iranchr('39')s electricity industry is dependent on fossil fuel consumption strongly, which causes environmental pollution. The aim of this study is to obtain the optimal combination o...

متن کامل

Optimal Mixture of Electricity Production Under Uncertainty: Case of Western Azerbaijan Province

In recent years, optimal use of fossil fuels, reduction of environmental pollution and exploitation of renewable energy is one of the most important issues in the policies of different countries, and as you know, Iranchr('39')s electricity industry is dependent on fossil fuel consumption strongly, which causes environmental pollution. The aim of this study is to obtain the optimal combination o...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Computers & OR

دوره 35  شماره 

صفحات  -

تاریخ انتشار 2008