Flexible job-shop scheduling with routing flexibility and separable setup times using ant colony optimisation method

نویسندگان

  • Andrea Rossi
  • Gino Dini
چکیده

This paper proposes an ant colony optimisation-based software system for solving FMS scheduling in a job-shop environment with routing flexibility, sequence-dependent setup and transportation time. In particular, the optimisation problem for a real environment, including parallel machines and operation lag times, has been approached by means of an effective pheromone trail coding and tailored ant colony operators for improving solution quality. The method used to tune the system parameters is also described. The algorithm has been tested by using standard benchmarks and problems, properly designed for a typical FMS layout. The effectiveness of the proposed system has been verified in comparison with alternative approaches. r 2006 Elsevier Ltd. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

New Routing Rules for Dynamic Flexible Job Shop Scheduling with Sequence-Dependent Setup Times

Flexible job shops are characterized by the existence of alternative –not necessarily identicalmachines, which permits parts to have different alternative routes in the shop. In a dynamic scheduling situation in which jobs continuously arrive over time, part routing rules are needed to deal with such routing flexibility as much as sequencing rules which define the order by which parts are admit...

متن کامل

Minimizing the maximum tardiness and makespan criteria in a job shop scheduling problem with sequence dependent setup times

The job shop scheduling problem (JSP) is one of the most difficult problems in traditional scheduling because any job consists of a set operations and also any operation processes by a machine. Whereas the operation is placed in the machine, it is essential to be considering setup times that the times strongly depend on the various sequencing of jobs on the machines. This research is developed ...

متن کامل

Job Shop Scheduling with Routing Flexibility and Sequence Dependent Setup-Times

This paper presents a meta-heuristic algorithm for solving a job shop scheduling problem involving both sequence dependent setup-times and the possibility of selecting alternative routes among the available machines. The proposed strategy is a variant of the Iterative Flattening Search (IFS) schema. This work provides three separate results: (1) a constraint-based solving procedure that extends...

متن کامل

A Hierarchical Production Planning and Finite Scheduling Framework for Part Families in Flexible Job-shop (with a case study)

Tendency to optimization in last decades has resulted in creating multi-product manufacturing systems. Production planning in such systems is difficult, because optimal production volume that is calculated must be consistent with limitation of production system. Hence, integration has been proposed to decide about these problems concurrently. Main problem in integration is how we can relate pro...

متن کامل

A Flexible Job Shop Scheduling Problem with Controllable Processing Times to Optimize Total Cost of Delay and Processing

In this paper, the flexible job shop scheduling problem with machine flexibility and controllable process times is studied. The main idea is that the processing times of operations may be controlled by consumptions of additional resources. The purpose of this paper to find the best trade-off between processing cost and delay cost in order to minimize the total costs. The proposed model, flexibl...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015