A modified generalized extremal optimization algorithm for the quay crane scheduling problem with interference constraints
نویسندگان
چکیده
The quay crane scheduling problem (QCSP) determines the handling sequence of tasks at ship bays by a set of cranes assigned to a container vessel such that the vessel’s service time is minimized. A number of heuristics or metaheuristics have been proposed to obtain the near-optimal solutions to overcome the NP-hardness of the problem. In this article, the idea of generalized extremal optimization (GEO) is adapted to solve the QCSP with respect to various interference constraints. The resulted GEO is termed as the modified GEO. A randomized searching method for neighboring task-to-QC assignments to an incumbent task-to-QC assignment is developed in executing the modified GEO. In addition, a unidirectional search decoding scheme is employed to transform a task-to-QC assignment to an active quay crane schedule. The effectiveness of the developed GEO is tested on a suite of benchmark problems introduced by Kim and Park (2004). Compared with other well known existing approaches, the experiment results show that the proposed modified GEO is capable of obtaining the optimal or near-optimal solution in reasonable time, especially for large-sized problems.
منابع مشابه
Addressing a Coordinated Quay Crane Scheduling and Assignment Problem by Red Deer Algorithm
Nowadays, there is much attention for planning of container terminals in the global trade centers. The high cost of quay cranes motivates both scholars and industrial practitioners especially in the last decade to develop novel optimization models to address this dilemma. This study proposes a coordinated optimization model to cover both Quay Crane Scheduling Problem (QCSP) and Quay Crane Assig...
متن کاملA Mathematical Model and Grouping Imperialist Competitive Algorithm for Integrated Quay Crane and Yard Truck Scheduling Problem with Non-crossing Constraint
In this research, an integrated approach is presented to simultaneously solve quay crane scheduling and yard truck scheduling problems. A mathematical model was proposed considering the main real-world assumptions such as quay crane non-crossing, precedence constraints and variable berthing times for vessels with the aim of minimizing vessels completion time. Based on the numerical results, thi...
متن کاملQuay Cranes and Yard Trucks Scheduling Problem at Container Terminals
A bi-objective mathematical model is developed to simultaneously consider the quay crane and yard truck scheduling problems at container terminals. Main real-world assumptions, such as quay cranes with non-crossing constraints, quay cranes’ safety margins and precedence constraints are considered in this model. This integrated approach leads to better efficiency and productivity at container te...
متن کاملYard crane scheduling in port container terminals using genetic algorithm
Yard crane is an important resource in container terminals. Efficient utilization of the yard crane significantly improves the productivity and the profitability of the container terminal. This paper presents a mixed integer programming model for the yard crane scheduling problem with non- interference constraint that is NPHARD in nature. In other words, one of the most important constraints in...
متن کاملQuay crane scheduling with non-interference constraints in port container terminals
The quay crane scheduling problem studied in this paper is to determine a handling sequence of holds for quay cranes assigned to a container vessel considering interference between quay cranes. This paper provides a mixed integer programming model for the considered quay crane scheduling problem that is NP-complete in nature. A genetic algorithm is proposed to obtain near optimal solutions. Com...
متن کامل