Bi-objective Network Optimization for Spatial and Temporal Coordination of Multiple Highway Construction Projects
نویسندگان
چکیده
Even though highway Construction and Maintenance (C/M) projects aim to improve transportation infrastructure and travel services, these highway C/M projects become one of the main reasons for causing traffic congestion on existing road transportation systems as well as traffic accidents in work zone areas. The number of work zones is increasing due to the aging infrastructure, which demands spatial and temporal coordination of these work zones for efficient use of the existing transportation network. Unlike other studies focused on the single C/M project level, this study deals with network-wide impacts of multiple C/M projects. This problem is formulated as a bi-objective multi-period transportation network optimization problem to seek an optimal schedule that coordinates multiple C/M projects. The objectives are to minimize the total system cost and to maintain minimum travel services between origins and destinations. A bi-objective genetic algorithm is employed to solve the multi-period network optimization problem. A numerical example shows that the optimal coordination saves more than 50% of waste in system costs, compared to the worst case scenario.
منابع مشابه
A BI-LEVEL LINEAR MULTI-OBJECTIVE DECISION MAKING MODEL WITH INTERVAL COEFFICIENTS FOR SUPPLY CHAIN COORDINATION
Bi-level programming, a tool for modeling decentralized decisions, consists of the objective(s) of the leader at its first level and that is of the follower at the second level. Three level programming results when second level is itself a bi-level programming. By extending this idea it is possible to define multi-level programs with any number of levels. Supply chain planning problems are co...
متن کاملA MULTI-OBJECTIVE DECENTRALIZED MULTIPLE CONSTRUCTION PROJECTS SCHEDULING PROBLEM CONSIDERING PERIODIC SERVICES AND ORDERING POLICIES
In decentralized construction projects, costs are mostly related to investment, material, holding, logistics, and other minor costs for implementation. For this reason, simultaneous planning of these items and appropriate scheduling of activities can significantly reduce the total costs of the project undertaken. This paper investigates the decentralized multiple construction projects schedulin...
متن کاملDEVELOPING THE LSM VPR SCHEDULING METHOD FOR SCHEDULING HIGHWAY CONSTRUCTION PROJECTS BASED ON EFFECTIVE FACTORS ON EMBANKMENT ACTIVITY PRODUCTIVITY
Highway construction projects are one of the most important construction projects in the world. Therefore predicting the time of these kinds of projects is important. Basically highway projects are including few activities which are repeating along the horizontal direction. One of the best methods for scheduling these types of projects is linear scheduling method. The repetitive nature of the h...
متن کاملUsing Hybrid Fuzzy PROMETHEE II and Fuzzy Binary Goal Programming for Risk Ranking: A Case Study of Highway Construction Projects
Multi attribute decision making methods are considered as one of the most useful methods for solving ranking problems. In some decision making problems, while the alternatives for corresponding criteria are compared in a pairwise comparison manner, if the criteria are inherently fuzzy, debates will arise in ranking alternatives due to the closeness of the values of the criteria. In this researc...
متن کاملA bi-level linear multi-objective decision making model with interval coefficients for supply chain coordination
Abstract: Bi-level programming, a tool for modeling decentralized decisions, consists of the objective(s) of the leader at its first level and that is of the follower at the second level. Three level programming results when second level is itself a bi-level programming. By extending this idea it is possible to define multi-level programs with any number of levels. Supply chain planning problem...
متن کامل