A two stage heuristic algorithm for the integrated aircraft and crew schedule recovery problems
نویسندگان
چکیده
Airline disruptions incurred huge cost for airlines and serious inconvenience for travelers. In this paper, we study the integrated aircraft and crew schedule recovery problem. A two stage heuristic algorithm for the integrated recovery problem is proposed. In the first stage, the integrated aircraft recovery and flight-rescheduling model with partial crew consideration is built. This model is based on the traditional multi-commodity network model for the aircraft schedule recovery problem. The objective of this model also includes minimization of the original crew connection disruption. In the second stage, the integrated crew schedule recovery and flight re-scheduling model with partial aircraft consideration is built. We proposed a new multi-commodity model for the crew schedule recovery. The main advantage of such model is that it is much more efficient to integrate the flight-scheduling and aircraft consideration. New constraints are incorporated to guarantee that the aircraft connections generated in the stage 1 are still feasible. Two stages are run iteratively until no improvement can be achieved. Experimental results show that our method can provide better recovery solutions compared with the benchmark
منابع مشابه
An integrated scenario-based approach for robust aircraft routing, crew pairing and re-timing
For reasons of tractability, the airline scheduling problem has traditionally been sequentially decomposed into various stages (e.g. schedule generation, fleet assignment, aircraft routing, and crew pairing), with the decisions from one stage imposed upon the decision-making process in subsequent stages. Whilst this approach greatly simplifies the solution process, it unfortunately fails to cap...
متن کاملIncreasing Stability of Crew Schedules in Airlines
In airline traffic disruptions occur frequently and cannot be totally avoided. They may lead to infeasible aircraft and crew schedules during the day of operations, due to absence of resources or violation of crew rules. The process of finding new schedules in such cases is called recovery or disruption management. The short-term recovery actions usually imply additional costs meaning that the ...
متن کاملA Rolling Horizon Based Algorithm for Solving Integrated Airline Schedule Recovery Problem
Airline disruption incurred huge cost for airlines and serious inconvenience for travelers. In this paper, we study the integrated airline schedule recovery problem, which considers flight recovery, aircraft recovery and crew recovery simultaneously. First we built an integer programming model which is based on traditional set partitioning model but including flight copy decision variables. The...
متن کاملDetermination of the Aircraft Landing Sequence by Two Meta-Heuristic Algorithms
Due to an anticipated increase in air traffic during the next decade, air traffic control in busy airports is one of the main challenges confronting the controllers in the near future. Since the runway is often a bottleneck in an airport system, there is a great interest in optimizing the use of the runway. The most important factors in aircraft landing modeling are time and cost. For this reas...
متن کاملIntegrated Order Batching and Distribution Scheduling in a Single-block Order Picking Warehouse Considering S-Shape Routing Policy
In this paper, a mixed-integer linear programming model is proposed to integrate batch picking and distribution scheduling problems in order to optimize them simultaneously in an order picking warehouse. A tow-phase heuristic algorithm is presented to solve it in reasonable time. The first phase uses a genetic algorithm to evaluate and select permutations of the given set of customers. The seco...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Computers & Industrial Engineering
دوره 87 شماره
صفحات -
تاریخ انتشار 2015