Innovative Methods in River Erosion Control - a Case Study of Erosion of Bhira-palia Railway Line by Sharda River in Up

نویسنده

  • M. U. Ghani
چکیده

Erosion of the river banks in India have become recurrent event causing enormous problem for the people and the Government. With the increase of population along the bank of the rivers, the erosion of township, cluster of villages and important communication system, govt. resources are over exploited. Presently a large number of township, villages, human dwellings a number of important installations and line of communications are under sever threat. The impact of erosion is unbearable and non-recoverable and inflicts permanent irreparable loss of disastrous dimensions to human being. As such it is emphasised to adopt scientific approach for erosion control on priority. The most responsible factor for river bank erosion is the flow of large quantity of silt in the river. Therefore, there is a great need either to check entry of silt into the river or desilt the silt when it has entered into the river. Various techniques are being adopted on case to case basis to stream line the flow taking into account the type and severity of the problem. In this paper a remedial measure adopted to tackle the erosion problem of Bhira-Palia Kalan railway line by the river Sharda in Lakhimpur Khiri district of U.P has been dealt is described briefly as below: River Sharda (known as Mahakali in Nepal) an important tributary of Ghaghra (Known as Kanali in Nepal) originates Nepal, enters into India in Philibhit district of Uttarakhand. The river bifurcates in two channels before entering into Lakhimpur Kheri district upstream of Vira-Palia Railway bridge. Before 2008 flood, 90 % discharge was passing through left channel and 10% discharge through the right channel upstream of railway bridge no. 98 before entering of entire flow into bridge no. 98. During the severest flood of 2008, the river started flowing with 100% discharge through right channel and flow became parallel to the railway track and then it was entering into the railway bridge 98. As a result it eroded the Malani-Bhira-Palia railway line and the running of trains was stopped for about two months. The Govt of U.P proposed a scheme of Rs. 37.64 crore for the protection of railway line and river bank along with a pilot channel to divert the flow in its original course. The scheme was received in GFCC. GFCC suggested for the closure of various channel of the river particularly the main channel flowing parallel to Railway line by the five rows of concrete porcoupine, permeable structures for closure of channel by siltation, cutting of pilot channel in its closed original channel which was carrying the flow of the river straightway to bridge no. 98. The total cost of the scheme was reduced to Rs. 10.40 crore. The scheme was implemented before the flood of 2009 in two months. The performance of the scheme was observed during the flood period of 2009. It was observed that major flow is taking place straight to the bridge no. 98 through the pilot channel and about 30% of the flow with insignificant velocity is passing through the channel of 2008 which is getting silted up and is not having any erosive action on the railway track. This paper discusses the scientific approach for erosion control in a tactful manner. Such kind of remedial measure is economical, easy to construct with locally available man and material and can be constructed in minimum period. COFFERDAM. AN EFFECTIVE TOOL FOR EMERGENT FLOOD MANAGEMENT WORKS A CASE STUDY OF KOSI BARRAGE AFFLUX BUND BREACH CLOSURE M.U.Ghani, Member, GFCC

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Investigation Resistance of Sediment Particle to Erosion in Saraskanchai River by Use of Mathematical Methods

In addition to Erodibility of sediment particles in river increase river sediment load, they are important factors in morphological changes. In the rivers that erodibility is high, trend of morphological changes are intensive that in this case, river is unstable. On the contrary, it will lead stability and low changes of the river. Study area of this research is Saraskanchay that has been locat...

متن کامل

The effect of morphotectonic factors on erosion and change of longitudinal profile of river using the mathematical functions (Case Study: Alvand River in the West Kermanshah Province)

The river’s Geomorphology and its evaluation explore explanation of erosion, the longitudinal profile of the river bed and different forms of the rivers. Alvand River as the main river of the Alvand basin is located in Kermanshah Province W, Iran. The aim of this study is to investigate changes in longitudinal and longitudinal profiles of the river bed using mathematical functions and their rel...

متن کامل

The effect of morphotectonic factors on erosion and change of longitudinal profile of river using the mathematical functions (Case Study: Alvand River in the West Kermanshah Province)

The river’s Geomorphology and its evaluation explore explanation of erosion, the longitudinal profile of the river bed and different forms of the rivers. Alvand River as the main river of the Alvand basin is located in Kermanshah Province W, Iran. The aim of this study is to investigate changes in longitudinal and longitudinal profiles of the river bed using mathematical functions and their rel...

متن کامل

Streambank erosion hazard analysis by BEHI method, case study: Sajadroud stream, Mazandaran province

Streambank erosion hazard analysis by BEHI method, case study: Sajadroud stream, Mazandaran province Extended Abstract Introduction River bank erosion is a complex natural process and plays an important role in the dynamic equilibrium of the river. The amount of river bank erosion affects the river plan, cross section and dimensions of the river and is the main factor controlling channel mig...

متن کامل

Investigating the Banks Sensitive to Erosion with an Emphasis on Geological, Geometric, and Hydraulic Characteristics: A Case Study of Bashar River

Extended abstract Introduction The vital need for river management is understood and predicts bank erosion processes. River bank erosion is one of the sediment major sources for many rivers across the world. Bank erosion is a key process in fluvial dynamics, affecting a wide range of physical, ecological and socio-economic issues in the fluvial environment. These include the establishm...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2009