Conflict In Project Teams: Gaining The Benefits, Avoiding The Costs

نویسندگان

  • Pat Holahan
  • Ann Mooney
چکیده

The articles in this issue are related in several ways. They both deal with important aspects of managing project teams. Holahan and Mooney provide guidance on how project teams can manage conflict to enhance decision outcomes and project performance. Dominick, Lechler and Aronson shed light on interpersonal behaviors that contribute to effective project leadership, providing guidelines for selecting and developing the leadership competencies of project managers.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Task conflict and relationship conflict in top management teams: the pivotal role of intragroup trust.

Task conflict is usually associated with effective decisions, and relationship conflict is associated with poor decisions. The 2 conflict types are typically correlated in ongoing groups, however, which creates a prescriptive dilemma. Three explanations might account for this relationship--misattribution of task conflict as relationship conflict, harsh task conflict tactics triggering relations...

متن کامل

Predicting future conflict between team-members with parameter-free models of social networks

Despite the well-documented benefits of working in teams, teamwork also results in communication, coordination and management costs, and may lead to personal conflict between team members. In a context where teams play an increasingly important role, it is of major importance to understand conflict and to develop diagnostic tools to avert it. Here, we investigate empirically whether it is possi...

متن کامل

DRIVING OPTIMUM TRADE-OFF BETWEEN THE BENEFITS AND COSTS OF INTERBASIN WATER TRANSFER PROJECTS

The interbasin water transfer is a remedy to mitigate the negative issues of water shortage in arid and semi-arid regions. In  a water transfer project  the receiving basin always  benefits while, the sending basin may suffer. In this study, the project of interbasin water transfer from Dez water resources system in south-west of Iran to the central part of the contrary is  investigated during...

متن کامل

Developing a conceptual model based upon the Latin Hypercube Sampling for integrating OHS into project risk evaluation

Abstract Project management in construction industry, in many cases, is imperfect with respect to the integration of Occupational Health and Safety (OHS) risks. This imperfection exhibits itself as complications affecting the riskiness of industrial procedures and is illustrated usually by poor awareness of OHS within project teams. Difficulties on OHS regularly came about in the construction i...

متن کامل

An Analytic Model for Organization Readiness of Engineering Project Management Based on Virtual Teams

 The Organization Readiness of Engineering Project Management Based on Virtual Teams has been analyzed in an Iranian Engineering firm. Adapting and analyzing the latest readiness model, experts’ opinions were received by questionnaires and main criteria of the readiness have been identified. The considered readiness criteria are: Infrastructure, Deliverables (Drawings, Reports, Minutes of Meeti...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2004