Two-machine Flowshop Scheduling Problem to Minimize Makespan or Total Completion Time with Random and Bounded Setup Times

نویسندگان

  • ALI ALLAHVERDI
  • YURI N. SOTSKOV
چکیده

This paper addresses the two-machine flowshop scheduling problemwith separate setup times to minimize makespan or total completion time (TCT). Setup times are relaxed to be random variables rather than deterministic as commonly used in the OR literature. Moreover, distribution-free setup times are used where only the lower and upper bounds are given. Global and local dominance relations are developed for the considered flowshops and an illustrative numerical example is given.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Flowshop Scheduling with Random and Bounded Setup Times

The two-machine permutation flowshop scheduling problem to minimize makespan or total completion time criterion is addressed where setup times are considered to be separate from processing times. Setup times are relaxed to be random variables as opposed to the common assumption in the literature that setup times are exactly known (deterministic) in advance. The probability distributions of setu...

متن کامل

Meta heuristic for Minimizing Makespan in a Flow-line Manufacturing Cell with Sequence Dependent Family Setup Times

This paper presents a new mathematical model for the problem of scheduling part families and jobs within each part family in a flow line manufacturing cell where the setup times for each family are sequence dependent and it is desired to minimize the maximum completion time of the last job on the last machine (makespan) while processing parts (jobs) in each family together. Gaining an optimal s...

متن کامل

A three-stage assembly flow shop scheduling problem with blocking and sequence-dependent set up times

This paper considers a three-stage assembly flowshop scheduling problem with sequence-dependent setup < /div> times at the first stage and blocking times between each stage in such a way that the weighted mean completion time and makespan are minimized. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time using traditiona...

متن کامل

An approximation scheme for two-machine flowshop scheduling with setup times and an availability constraint

This paper studies the two-machine permutation flowshop scheduling problem with anticipatory setup times and an availability constraint imposed only on the first machine. The objective is to minimize the makespan. Under the assumption that interrupted jobs can resume their operations, we present a polynomial-time approximation scheme (PTAS) for this problem.

متن کامل

A fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates

This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2002