Frequency of time overrun causes in road construction in Palestine : Contractors

نویسنده

  • Ibrahim Mahamid
چکیده

Time, cost and quality have their proven importance as the prime measures for project success. However, the history of the construction industry worldwide is full of projects that were completed with significant time and cost overruns. This study is conducted to investigate the occurrence frequency of time overrun causes in road construction projects in the West Bank in Palestine from contractors’ viewpoint through a questionnaire survey. The field survey included 34 contractors. 52 factors affecting time overrun were identified during the research. The survey concluded that the top ten frequent factors are: segmentation of the West Bank and limited movement between areas, political situation, progress payments delay by owner, lack of equipment efficiency, difficulties in financing project by contractor, personal conflicts among labors, poor communication by consultant with other construction parties, conflict between contractor and other parties, award project to lowest bid price, unreasonable project time frame by the owner. DOI 10.5592/otmcj.2013.1.9 Research paper Ibrahim Mahamid

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Analysis of Cost Overrun in Highway Construction Projects Using Multiple Regression and Artificial Neural Networks

Cost overruns are more common in infrastructure projects especially, more common in road construction activities. There existed a need to develop a probabilistic cost overrun analysis model in construction projects as a decision support tool for contractors before the bidding stage. The objective of this study is to identify the critical factors affecting cost overrun and obtain statistical mod...

متن کامل

Identification of the Causes of Construction Delay in Malaysia

Construction delay is unavoidable in developing countries including Malaysia. It is defined as time overrun or extension of time for completion of a project. The purpose of the study is to determine the causes of delay in Malaysian construction industries based on previous worldwide research. The field survey conducted includes the experienced developers, consultants and contractors in Malaysia...

متن کامل

Significant Factors Causing Cost Overruns in Large Construction Projects in Malaysia

Once a construction projects fails in achieving effective cost performance, it will result to cost overmn. These ovemrns are caused from several factors which are very important to uncover for improving the cost performance. In Malaysia, not many research works have been carried out on study~ng cost performance factors. Hence, this study was conducted to identify the significant factors causing...

متن کامل

Is Training Contractors in Safety Issues Effective in Minimizing Occupational Accident Rates? A Retrospective Cohort Study

Background: Safety of contractors is one of the key safety challenges at construction. Safety training, as an essential prerequisite for achieving safety qualification certificates by contractors, could decrease accident rates in the construction. This study aims to evaluate the effectiveness of training construction contractors in safety issues in minimizing occupational accidents in a five-ye...

متن کامل

Evaluating Contractor Performance: Application to the Dubai Construction Industry

Predicting the performance of the contractor is very important for both the contractor and the owner especially in highly competitive markets. The research presented in this paper offers a new model for contractor performance prediction. The model developed here utilizes qualitative as well as previously unconsidered quantitative measures about the contractors’ performance. The model makes use ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013